Laserfiche WebLink
9/1/2015 <br /> CL 0 <br /> P.0 Box 930220 Bo <br /> Verona,WI 53593-0220 BREUNIG,HERB <br /> Doc ID:8965020150901081056 <br /> BUILDING CORP. Phone:(608)845-9700 <br /> ClearyBuilding.com Fax:(608)845-7070 C eary/Owner Project Proposal - Erected <br /> "D" = Bottom elevation (B.E.)of overhead door: 0' 0" <br /> The bottom of all overhead doors(top of finished floor)are <br /> recommended to be placed at 4"above the 100'-0" mark(100'-4"). In <br /> building without paved floors, B.E.of doors may be lower-e.g. 100'- <br /> 0„ <br /> "E" = Height of overhead door: 10'0" <br /> 4 _ w Overhead door height = the height of the overhead door being placed <br /> in this building. <br /> "F" = Available headroom: 1' 11" <br /> Available headroom = the space available for overhead door tracks <br /> and openers. If a ceiling is installed, headroom will be reduced by <br /> about 1". Door headroom requirements must be confirmed with the <br /> door supplier. <br /> l_ Headroom calculation formula: <br /> („B")- („D.,)-(„E°) = (°F„) <br /> (Truss Clearance)- (B.E.of overhead door)- (Overhead door height) = <br /> (Available headroom) <br /> Example: <br /> (10'-0")- (4")-(8'-0") = (1'-8" of available headroom) <br /> Additional Building Components <br /> Excavating/Site Prep <br /> dig footing, back fill concrete walls and prep for concrete floor, (owner to supply sand fill),clear tree stumps,and level <br /> around walls for construction <br /> Clopay Garage Doors <br /> 1-18' x 10'and 1-10'x 10'#680 with lites,openers, remotes, exterior keypad, Kynar Beige color <br /> Concrete Floor <br /> 1806 sq.ft.of 5"concrete floor(bldg + approach, Install drain in concrete floor to outside surface,2" insulation under 48” <br /> interior perimeter for heated bldg. 1” insulation vertical on walls from top floor down 24" <br /> Concrete Wall <br /> 92' of 8'wall,40'of 6'wall,42' of frost wall.1-4' pilaster on solid endwall <br /> Project Investment <br /> Project as specified:$60,825 <br /> Cash discount(3%):$1,825 <br /> Total with discounts:$59,000 <br /> .Please note this price is subject to change without notice after 9/3/2015 <br /> •Includes material,labor,tax,delivery,warranties and builder's risk insurance. <br /> v12;o built with pri before the is applied 13 of 15 <br />