Laserfiche WebLink
2. The uses, values, and enjoyment of other property in the neighborhood for purposes already <br /> permitted shall be in no foreseeable manner substantially impaired or diminished by <br /> establishment, maintenance or operation of the conditional use. <br /> • The property on which Enbridge proposed to construct its pump station is already being <br /> utilized for multiple pipeline and utility purposes. A large American Transmission <br /> Company (ATC) distribution sub-station and the existing Enbridge "Waterloo" pumping <br /> station are currently located at the site is. The ATC substation provides power to <br /> Wisconsin Electric Power Company (WEPCO) for distribution to surrounding <br /> communities. The existing Enbridge pumps station is of the same use as the proposed <br /> pumping station. By expanding its existing pump station, and co-locating with other <br /> utility uses, Enbridge has maximized its existing facilities to the greatest extent possible; <br /> thereby,minimizing the impacts to the neighborhood. <br /> • The expanded Enbridge "Waterloo Station," like Enbridge's other pump stations, is <br /> designed, built and landscaped to minimize visual impact, thus protecting the comfort <br /> or general welfare of the nearby citizens. <br /> • Enbridge has incorporated the adjoining residential landowner's request into the design <br /> of the station, which includes matching the new building color to that of the existing <br /> building and installing noise attenuation insulation into the pump shelter to reduce <br /> sound from the equipment housed inside. <br /> • The expansion at Enbridge "Waterloo Station" will not require pipeline replacement or <br /> construction outside of Enbridge facilities. All work will be performed on property <br /> Enbridge leases. <br /> • Station facilities are secured and fenced, with lighting designed to provide security yet <br /> minimal disturbance to neighbors. Any noise from the pumps is insulated within the <br /> buildings, which look like a typical storage, or pole building; sound is similar to an air <br /> conditioner unit at about 50 feet from the fence. Typical background noise levels from <br /> our pump stations, in a rural setting, are approximately 40 decibels at a distance of 300 <br /> meters. <br /> • During construction, an average of 10-12 semi-trucks will be transporting supplies to <br /> and from the facility as needed;construction workers will have their own vehicles. Once <br /> the facility is operational,there will be one to two trucks routinely travelling to and from <br /> the facility for operation and maintenance activities. Enbridge will make every effort to <br /> minimize disruption to adjacent neighbors. <br /> • To minimize environmental impacts in the event of a release, Enbridge pump stations <br /> have protective barriers, including berms and graded soil, in place to protect the <br /> surrounding area. Berms are built according to Enbridge specifications and regulatory <br /> requirements using clay or compacted soil and grading to allow drainage to a designated <br /> area within the facility and on Enbridge property. <br />