- 618 <br /> said item is also hauled,such hauling not covered by a specific contract item will not be it <br /> paid for directly, but will be construed to be subsidiary work included u lder other 1 <br /> • contract items. <br /> 1 <br /> SECTION 618. MAINTENANCE AND REPAIR OF 1 <br /> HAUL ROADS r <br /> s <br /> p • <br /> 618.1 Description.This item of work shall consist of maintaining. reF airing and {a <br /> restoring all public roads and streets, including drainage facilities and other appurte- <br /> nances thereto, not a part of the State Trunk Highway System or a desigm.ted detour <br /> thereof,over which materials are hauled by the contractor,or subcontractor:,or suppli- a <br /> ers of the contractor, incident to work under a contract on the State Truni: Highway 1 <br /> T_ <br /> System or street over which a part of such system is routed, hereinafter A lled haul 4 <br /> -.roads, to a condition equivalent to that which would have prevailed had such hauling <br /> not occarte. <br /> S a contractors obligation under this item does not authorize the use of haul roads <br /> F-� for transporting loads exceeding statutory size and mass limitations. 1 <br /> _ , <br /> .'rv:: 618.2 Materials.All materials required and used in the work shall be of a quality ; <br /> : - and serviceability at least equivalent to those existing in the road prior to is use as a. <br /> haul road.The amount,quality and acceptability of all materials will be detormined by , <br /> i <br /> ' f the engineer. <br /> r � a <br /> 618.3 Construction Methods. , <br /> 618.3.1 General.The engineer will determine the type and quality of rr aintenance <br /> _ ' _^4 and repair required, including the quality of materials to be used If two or more con- �, <br /> tractors having contracts with the Department engage in transport of materi ils over the <br /> ;;^.;r" same haul road at the same time or at about the same time the engineer wil.determine <br /> _` fhe repair and restoration obligations of the respective contractors. `= <br /> `s` "._''~� 618.3.2 Maintenance.The engineer shall have the authority to order such mainte- <br /> �y -fiance and repair work on haul roads,including dust abatement,at any time while haul- <br /> ;;:Z'::==-itig is in progress,as may be necessary to insure reasonable service to other asers of the <br /> `;,4F:-. ;road. it <br /> x To prevent or minimize damage to haul roads the contractor may stabilize, rein- i <br /> ..-=5-11=;" force or strengthen existing facilities before hauling starts and may condition the sur- <br /> -lace and perform repairs during hauling operations. <br /> :; 618.3.3 Restoration.Upon cessation of hauling operations and before anal accep- , f <br /> #= <br /> ---.!c.-7;,..,- <br /> --'stance of the work under the contract,the contractor shall restore all haul ro ids, includ- <br /> ;- ' ' ng drainage facilities, to the condition equivalent to that which would ha■e prevailed #1 <br /> q. ;,, had such hauling of material not occurred. , ii <br /> The final repair of a haul road shall meet the engineer's approval <br /> _,^ 618.4 Method of Measurement. This item will be measured for payment as a <br /> single complete unit of work. <br /> ; 618.5 Basis of Payment.This item of work, measured as provided ab)ve, will be <br /> -- paid for at the contract lump sum price for Maintenance and Repair of Haul Roads, <br /> '+.44,4- Iwhieh price shall be payment in full for furnishing,hauling and placing rec aired mate- <br /> .-, <br /> __; _°.,�pals;for all labor, tools, equipment and all other costs necessary to complete the work <br /> 449 <br /> 20'd P888 SP8 809 'ON I `Nd100 8 3NAdd SZ:0 ti 866 T-2Z-Nr J' <br />