|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-0000-01503
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
CUPS 00001-02383
>
DCPCUP-0000-01503
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2015 3:47:47 PM
Creation date
11/6/2015 1:51:07 PM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
01503
Town
Oregon Township
Section Numbers
17
AccelaLink
DCPCUP-0000-01503
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r <br /> i s <br /> I <br /> 618 <br /> to the satisfaction of the engineer; and for other costs incurred by the contractor to <br /> prevent or minimize damage to the haul roads. <br /> This item will be paid for upon completion of all work under the contract,except <br /> that, as determined by the engineer, partial payments for this .tem may be allowed in <br /> amounts which are approximately proportional to the completi)n of the portions of the <br /> `• contract for which haul roads are used. <br /> SECTION 619. MOBILIZATION <br /> 619.1 Description.This item shall consist of the work and operations necessary for <br /> the movement of personnel,equipment, supplies and incidentals to the project site and <br /> for establishment of all contractor's offices,buildings,sanitary and other facilities nec- <br /> essary for work on the project; and of all other work and operations which must be <br /> performed or for which costs must be incurred before beginning work on the various <br /> items on the project site. <br /> 619.2 Method of Measurement. Mobilization will be measured for payment as a <br /> single complete unit of work,acceptably performed. <br /> 619.3 Basis of Payment. This item of work, measured as ,rovided above, will be <br /> paid for at the contract lump sum price for Mobilization, w rich price shall be full <br /> compensation for supplying and furnishing all.materials,facilities and services,and for <br /> performing all work necessary for the completion of this item. <br /> The contract lump sum shall be payable to the contractor in accordance with the <br /> following schedule: <br /> When five percent or more of the original contract amount is earned,25 percent of <br /> the amount bid for Mobilization will be paid. <br /> When 25 percent or more of the original contract amount s earned, 50 percent of <br /> I the amount bid for Mobilization will be paid. <br /> When 50 percent or more of the original contract amount .s earned, 75 percent of <br /> the amount bid for Mobilization will be paid.' ' <br /> When 75 percent or more of the original contract amount i.;earned, 100 percent of <br /> the amount bid for Mobilization will be paid. <br /> .When the contract does not include a separate contract item for Mobilization, any <br /> fi necessary Mobilization shall be construed to be subsidiary work included under other <br /> i contract items and will not be paid for directly. <br /> i <br /> SECTION 620. CONCRETE CORRUGATED MEDIAN <br /> 620.1 Description.This work shall consist of the construct ion of concrete median <br /> Iplaced in one course on a prepared foundation; at the locations and in reasonably close <br /> t conformity with the design,dimensions,lines and grades:all as shown on the plans and <br /> r provided in the contract. <br /> 620.2 Materials. Materials furnished and'used in the worll shall meet the require- <br /> , <br /> ments for the class of material named and as liereinafter specilied. <br /> Concrete Masonry Section 501 <br /> 1 Joint Filler Subsection 415.2 <br /> Reinforcement Section 505 <br /> j <br /> j 450 ' <br /> b0'd P888 8P8 809 '311I `Nti1Oa '8 3NA d 9Z:0 T 866 T-2Z-Nf J' <br />
The URL can be used to link to this page
Your browser does not support the video tag.