|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-0000-01484
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
CUPS 00001-02383
>
DCPCUP-0000-01484
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2015 4:10:33 PM
Creation date
11/9/2015 3:41:25 PM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
01484
Town
Verona Township
Section Numbers
28
AccelaLink
DCPCUP-0000-01484
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
326
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SITE DEVELOPMENT DESCRIPTION <br /> Description of operation: <br /> • Sand and gravel excavation, processing, delivery. <br /> Timing of site development: <br /> • Site development and operation will begin as soon as possible after <br /> C.U.P. approval, and after acquiring all other required permits, such as a <br /> W.D.O.T. permit to construct operations access to STH 69, and STH 69 <br /> turn lanes. <br /> • Planned commencement: May 1998 <br /> Estimated date for completion of excavation: 2022 <br /> Estimated date for completion of reclamation: 2023 or within 12 months of <br /> depletion of sand & gravel. <br /> THE SITE WILL BE DEVELOPED IN THREE PHASES: <br /> See Plans <br /> Phase I: <br /> • Contains the operations area and will be the site for the initiation of gravel <br /> extraction. <br /> • The operations area will be the site for crushing, washing, stockpiling, loading, <br /> scaling, and dispatching the delivery trucks. <br /> • This phase will be accessed only by a paved haul road from STH 69 as shown on <br /> the plans. <br /> Phase II: <br /> • This phase will be accessed by the existing field entrance on STH 69 as shown o_n <br /> the plans. <br /> • Equipment accessing this phase will only be the equipment used to perform the <br /> grading, excavating, and the crushing and/or screening. <br /> • The excavated sand & gravel will be delivered to the operations area (Phase) by <br /> a conveyor system which will cross under STH 69 within a culvert. <br /> • The conveyor system will minimize or eliminate the need for trucks to cross <br /> STH 69 from Phase II to the operations area in Phase I. <br /> • When sand and gravel extraction is completed in Phase II, the berms will be re- <br /> contoured per the reclamation plan included in the plans. <br /> Note: The northern limit of Phase II extraction will be determined by discussion and <br /> permit acquisition from Dane County and the WDNR to excavate within the <br /> flood plain or within the 500 foot limit of Badger Mill Creek. The northern limit <br /> of Phase II, at this time, has been indicated outside of those areas, as indicated <br /> on the plans. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.