|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-0000-01484
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
CUPS 00001-02383
>
DCPCUP-0000-01484
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2015 4:10:33 PM
Creation date
11/9/2015 3:41:25 PM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
01484
Town
Verona Township
Section Numbers
28
AccelaLink
DCPCUP-0000-01484
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
326
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Phase III: <br /> • Sand and gravel will be extracted from this Phase only if permits can be obtained <br /> from the DNR and Dane County to operate within the 500 ft. limit of Badger <br /> Mill Creek. <br /> • At the completion of sand and gravel extraction from Phase II and/or Phase III <br /> (again, Phase III is dependent on permit acquisition), the remainder of Phase I <br /> will be extracted, processed, and delivered. <br /> • Phase I will then be reclaimed per the reclamation included in the plans. <br /> Operational Items: <br /> • Hours of Operation: 7:00 a.m. to 7:00 p.m. Monday thru Friday. <br /> • No fuel will be stored on the site. <br /> • All equipment will be fueled as needed by fuel delivery trucks. <br /> • All truck loads leaving the site will be tarped. <br /> • A fugitive dust control plan will be implemented. Exhibit E -4 <br /> • A surface water pollution prevention plan will be implemented. Exhibit E-5 <br /> Sources, quantities, disposition of water to be used: <br /> 1. Source <br /> a. Groundwater <br /> b. Surface runoff <br /> 2. Disposition <br /> a. Water flows through a series of retention ponds <br /> Final disposition <br /> 1. Re-Use <br /> 2. Return to groundwater <br /> 3. Evaporation <br /> b. Dust control of interior roads - evaporation <br /> c. Dust control of processing, sizing and stockpiling of material <br /> 3. Quantity of Water: <br /> a. Haul road, crushing and site dust control - 0 to 1,000 gal/day <br /> Note: Use of water for dust management depends on weather and <br /> operating conditions. <br /> b. Aggregate Washing: <br /> 3000- 7000 gallons per day that plant operates. <br /> c. All water from the wash plant is delivered to a series of retention <br /> ponds for re-use or returned to groundwater. <br /> Reclamation: <br /> *See reclamation plan. <br /> • All berms will have final slopes flatter than 3:1. <br /> • The site will be clear of debris and left in a workmanlike condition at final <br /> reclamation. <br /> • • All reclaimed areas will be covered with topsoil and seeded to prevent erosion. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.