Laserfiche WebLink
r+ . <br /> E-2 <br /> PAULSON & ASSOCIATES, LLC <br /> SURVEYING AND ENGINEERING <br /> Parkview Office Building (608) 846-2523 <br /> 136 West Holum Street <br /> DeForest, Wisconsin 53532 <br /> January 26, 1998 <br /> Fitchburg Mineral, LLC <br /> Payne & Dolan, Inc.. <br /> Subject: Proposed Mineral Extraction <br /> Herfel Properties, Town of Verona <br /> At your request, I have studied the potential traffic impact for the subject site along <br /> STH 69, south of the City of Verona. I am suggesting improvements to STH 69 that <br /> should be considered in order to provide a safe access for this type of land use. <br /> You have indicated that the operations area would be located on the 40 acres <br /> described as the SE 1/4 of the SE 'A of Section 28, Town of Verona. Lands west of <br /> STH 69 and north of Riverside Road are also under your control but are reserved for <br /> future phases. <br /> Site Specifics <br /> 1. ADT on STH 69 is 3,000 vehicles per day (1996 WisDOT data southeast of the site <br /> near Paoli). <br /> 2. Visibility is good in all directions. There are no high banks or steep cut slopes <br /> adjacent to the roadway. <br /> 3. Alignment of STH 69 is straight and on a slight upgrade to the north (less than 0.3 <br /> percent). A 6-degree horizontal curve to the southeast begins approximately 560 <br /> feet south of the Riverside Road intersection. <br /> 4. Right-of-way on both STH 69 and Riverside Road is 66 feet with no existing vision <br /> triangles by either deed or easement. <br /> Anticipated Use of Access <br /> 1. Approximately 300,000 tons of aggregate annually would be hauled from the site. <br /> 2. 90 percent, or more, would be trucked north along STH 69 toward the Verona <br /> Bypass (USH 18-151). <br />