|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPREZ-0000-01498
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
DCPREZ-0000-01498
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2015 3:19:22 PM
Creation date
11/10/2015 3:19:13 PM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
Rezone
Petition Number
01498
Town
Cottage Grove Township
Section Numbers
33
AccelaLink
DCPREZ-0000-01498
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 2 <br /> •ONDITIONS: <br /> These conditions are specif. cally made applicable to this permit, <br /> any violation of such conditions shallbe sufficient grounds for <br /> revocation of this permit. <br /> 1. The applicant shall submit . erosion control plan covering the entire CUP area for <br /> the duration of operations, • d receive approval of an erosion control permit prior <br /> to commencing extraction o erations. <br /> 2. The applicant shall apply for and receive all other required local, state, and federal <br /> permits. <br /> 3. The operator shall develop •' d operate the site according to the revised site and <br /> operations plans dated 2/3/9:. Berms shall be constructed and seeded according to <br /> these plans and the prelimin• erosion control plan. <br /> 4. Hauling from the site shall nit begin until the USH 12-18 reconstruction project <br /> begins. <br /> 5. Operations shall cease no lat-r than 4 years from the date of issuance of the erosion <br /> control permit <br /> 6. Reclamation shall be comple ed within one year after operations have ceased, and <br /> shall be phased according to the revised operations and reclamation plan dated <br /> 2/3/98. Extraction of materi. s (aside from topsoil and overburden) in Phase 2 of <br /> the project shall not begin u til the Phase 1 area is reclaimed. <br /> 7. The operator shall post and 0 aintain at all times a bond or irrevocable letter of <br /> credit in favor of the Town .f Cottage Grove and Dane County in the amount of <br /> $57,000 to ensure compliance with the reclamation plan. <br /> 8. Off-site removal of subsoil o erburden shall not be allowed. <br /> 9. All drive aisles shall be eithe graveled or paved according to the revised operations <br /> plans, and shall be maintaine s in a dust free manner in accordance with local, state, <br /> and federal regulations. <br /> 10. Hours of operation, except •r crushing, screening, and washing, shall be from 6 <br /> a.m. to 6 p.m., Monday thro gh Friday, and from 8 a.m. to 3 p.m. on Saturday. <br /> Crushing, screening, and w. .hing shall not occur before 7 a.m. on Monday through <br /> Friday and 8 a.m. on Saturday. No operations of any kind shall take place on <br /> Sundays or legal holidays. ours may be extended temporarily if approved by the <br /> town board, with written no'ification being given to county zoning. <br /> 11. Trucks shall exit the site dir: ly to the USH 12-18 reconstruction project rather <br /> than to CTH N whenever possible and subject to any required WisDOT approvals. <br /> The operator shall work wit WisDOT and highway project contractors to <br />
The URL can be used to link to this page
Your browser does not support the video tag.