Laserfiche WebLink
• <br /> Page 2 <br /> C.NDITIONS: <br /> These conditions are specifi ally made applicable to this permit, <br /> any violation of such conditions shallbe sufficient grounds for <br /> revocation of this permit. <br /> 1. The applicant shall submit • erosion control plan covering the entire CUP area for <br /> the duration of operations, • id receive approval of an erosion control permit prior <br /> to commencing extraction operations. <br /> 2. The applicant shall apply for : d receive all other required local, state, and federal <br /> permits. <br /> 3. The operator shall develop • d operate the site according to the revised site and <br /> operations plans dated 2/3/9:. Berms shall be constructed and seeded according to <br /> these plans and the prelimin. erosion control plan. <br /> 4. Hauling from the site shall net begin until the USH 12-18 reconstruction project <br /> begins. <br /> 5. Operations shall cease no lat:r than 4 years from the date of issuance of the erosion <br /> control permit <br /> 6. Reclamation shall be comple -d within one year after operations have ceased, and <br /> shall be phased according to he revised operations and reclamation plan dated <br /> 2/3/98. Extraction of materi. s (aside from topsoil and overburden) in Phase 2 of <br /> the project shall not begin un it the Phase 1 area is reclaimed. <br /> 7. The operator shall post and i aintain at all times a bond or irrevocable letter of <br /> credit in favor of the Town o Cottage Grove and Dane County in the amount of <br /> $57,000 to ensure complianc• with the reclamation plan. <br /> 8. Off-site removal of subsoil o erburden shall not be allowed. <br /> 9. All drive aisles shall be either graveled or paved according to the revised operations <br /> plans, and shall be maintaine• in a dust free manner in accordance with local, state, <br /> and federal regulations. <br /> 10. Hours of operation, except for crushing, screening, and washing, shall be from 6 <br /> a.m. to 6 p.m., Monday thro gh Friday, and from 8 a.m. to 3 p.m. on Saturday. <br /> Crushing, screening, and was 'ng shall not occur before 7 a.m. on Monday through <br /> Friday and 8 a.m. on Saturda, . No operations of any kind shall take place on <br /> Sundays or legal holidays. Hours may be extended temporarily if approved by the <br /> town board, with written not fication being given to county zoning. <br /> 11. Trucks shall exit the site dire.tly to the USH 12-18 reconstruction project rather <br /> than to CTH N whenever po-sible and subject to any required WisDOT approvals. <br /> The operator shall work with WisDOT and highway project contractors to <br />