|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-0000-01476
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
CUPS 00001-02383
>
DCPCUP-0000-01476
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2015 4:23:57 PM
Creation date
11/10/2015 4:23:52 PM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
01476
Town
Cottage Grove Township
Section Numbers
28, 33
AccelaLink
DCPCUP-0000-01476
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
COMPOSITE REPORT - Page 2 APPLICATION NO. <br /> STAFF COMMENTS <br /> REGIONAL PLANNING <br /> CUP 1476. This proposed mineral extraction site is associated with the reconstruction of USH 12& <br /> 18. This appears to be a logical site to minimize haul distances. <br /> The site is near Little Door Creek, which raises concern for erosion and runoff. It is a very visible site <br /> and therefore should probably be limited to the duration of the road construction. <br /> Conditions should be similar to those recently imposed on other mineral extraction sites. Conditions <br /> should emphasize: <br /> Erosion and runoff control <br /> Specific relationship with the highway project <br /> Reclamation of the site for farmland. <br /> ENVIRONMENTAL HEALTH (septic, etc.) <br /> DANE COUNTY HIGHWAY <br /> C.U.P. 1486. CTH"N' is a controlled access highway. A controlled access permit changing the use <br /> and location will be required from the Transportation Committee. The access will require an improved <br /> intersection with a passing lane if traffic warrants. At this time we are unclear as to the amount of <br /> projected traffic that will be using the access assuming that an alternative access will be utilized during <br /> the construction of USH 12. An approved design will be required prior to the construction of this <br /> access. <br /> The relocated entrance as noted on the conceptual is not acceptable since it does not conform to the <br /> controlled access ordinance, it is closer than 600 feet to an existing access. Also, construction of an <br /> access would be difficult at this location due to the amount of fill that would be required to construct an <br /> access. The access could be relocated further to the south and still have adequate sight vision. <br /> OTHER <br />
The URL can be used to link to this page
Your browser does not support the video tag.