Laserfiche WebLink
Henshue Holdings, LLC. <br /> Memorandum to Support Conditional Use Permit <br /> Page 2 <br /> Approximately 50,000— 75,000 cubic yards will be removed from lot 7 annually. This <br /> amount may vary or change, depending on market demand for fill sand material in the <br /> surrounding area. In addition, some of the fill sand material will be used to grade and fill <br /> in lots 1-6 when they are developed by Welton Enterprise. The majority of the fill sand <br /> material will be trucked off site to construction projects within an approximate five (5) <br /> mile radius of the property. There will be no blasting or drilling on the site. A <br /> construction entrance will be installed and maintained during soil removal. If needed, the <br /> construction entrance will be watered daily to control dust. Hours of operation will be <br /> from 6:00 a.m. to 6:00 p.m., Monday through Friday, and from 7:00 a.m. to 5:00 p.m. on <br /> Saturday. Trucks will exit the site onto Hoffman House Lane and then onto Highway 51. <br /> When the extraction site is not open, the access road onto Hoffman House Lane will have <br /> a gate securely locked. <br /> Reclamation <br /> After removal of fill sand material, lot 7 will be at the elevations as shown on Exhibit C. <br /> In addition, throughout the entire fill sand extraction process, a detention basin will be <br /> built and maintained in order to contain surface water on lot 7. All topsoil will be <br /> stripped just prior to removal of fill sand material. This topsoil will be stockpiled on site <br /> and later used to restore the site. <br />