|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-0000-01478
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
CUPS 00001-02383
>
DCPCUP-0000-01478
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2015 10:20:51 AM
Creation date
11/20/2015 10:19:07 AM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
01478
Town
Blooming Grove Township
Section Numbers
1
AccelaLink
DCPCUP-0000-01478
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 2 <br /> 2 . The operator shall submit to Dane County an erosion <br /> control plan covering the CUP area for the duration of <br /> operations, and receive approval of an erosion control <br /> permit prior to commencing extraction operations in <br /> Areas 3 and 4 on the site plan. <br /> 3 . The operator shall develop and operate the site <br /> according to the site and operation plan received <br /> 2/26/98 . <br /> 4 . All operations shall cease and the entire site shall be <br /> reclaimed by December 7, 2001, according to the <br /> Reclamation Plan received 2/26/98 . Extraction of <br /> materials in Area 4 shall not begin until Area 3 is <br /> reclaimed. <br /> 5 . Trucks shall access the site from the designated service <br /> road only. All drive aisles shall be maintained in a <br /> dust free manner in accordance with local, state, and <br /> federal regulations . <br /> 6. The site shall be signed "no trespassing." When the <br /> extraction site is not open, the access road shall have <br /> gates securely locked. <br /> 7 . Hours of operation shall be from 7 : 00 a.m. to 4 : 30 p.m. , <br /> Monday through Friday, unless otherwise provided through <br /> the agreement between the operator and the town. <br /> 8 . There shall be no blasting or drilling on the site. <br /> 9 . There shall be no bulk fuel stored on the site. <br /> 10 .No water shall be removed from the site in order to <br /> maintain groundwater discharge to adjacent areas . <br /> 11 . The operator shall spray the site with water if and when <br /> needed to control dust . <br /> 12 . The operator shall require all trucks, excavation, and <br /> other equipment to have muffler systems which meet or <br /> exceed then current industry standards for noise <br /> abatement . <br /> 13 . The applicant shall meet DNR standards for particulate <br /> emissions as described in NR 415 . 075 and 415 . 076, Wis . <br /> Adm. Code. <br /> 14 . J&H of Wisconsin, Inc. shall provide a surety bond or <br /> other mutually acceptable financial assurance to the <br /> City of Madison to ensure maintenance of, and any <br /> required repair to, Sprecher Road and the unnamed <br /> service road resulting from the frequency of travel and <br /> normal hauling weights on said roads providing primary <br /> access to the property. The City Engineer recommends <br /> that this bond be in the amount of $40, 000 . <br />
The URL can be used to link to this page
Your browser does not support the video tag.