Laserfiche WebLink
COMPOSITE REPORT-Page 7 <br /> Application No.-CUP 1418 <br /> 8. Hours of operation shall be from 6:30 a.m. to 6:30 p.m., Monday <br /> except that crushing shall not begin before 8:00 a.m. No operations of an <br /> through Friday, <br /> shall take place on Saturdays, Sundays, any kind <br /> permitted during June, July, and Augustand legal holidays. Crushing shall not be <br /> 9. There shall be no blasting or drilling on the site. <br /> 10. There shall be no bulk fuel stored on site. <br /> 11. The operator and all haulers shall access the CUP site only throug <br /> designated as entrances on the Site/Operations Plan dated 1/13/98.those points <br /> 12. The site shall include a five foot fence as shown in the Site/Operations <br /> 1/13/98. That fence should be replaced to the west as the edge of the Plan dated <br /> area moves in that direction. During o extraction <br /> shall be maintained at a slope no greater than 1 sl the edge of the extraction area <br /> trespassing." p The site.shall be signed "no <br /> 13. No water shall be pumped or otherwise removed from the site in <br /> groundwater discharge to adjacent areas. order to maintain <br /> 14. The operator shall require that all trucks have muffler systems w hich meet or <br /> exceed the then current standards for noise abatement, and shall require that <br /> excavation and crushing equipment meet or exceed the then current industry all <br /> try <br /> standards for noise abatement. <br /> 15. The operator shall use spray bars (water)in the crushing process <br /> reduce dust. <br /> Use of spray bars is not required when the temperature is below free <br /> operator shall spray the site with water if and when needed to control dust.The <br /> 16. The operator shall create and maintain throughout the term of the CUP <br /> berms not less than eight feet in height and located as shown on the eOthra <br /> Plan dated 1/13/98. The berm shall be seeded. a Site/Operations <br /> 17. The operator shall repair any damage to town roads resulting from <br /> extraction operation, according to an agreement between the operator and tow <br /> 18. At the town's discretion, the Town Board or Plan Co town. <br /> operation annually. Any amendments to the CUP, including those review change the <br /> conditions stated herein, would have to be approved by g e to mange other <br /> Y the ZNR Committee. <br />