|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-0000-01418
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
CUPS 00001-02383
>
DCPCUP-0000-01418
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2016 1:32:45 PM
Creation date
11/23/2015 2:53:22 PM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
01418
Town
Roxbury Township
Section Numbers
3
AccelaLink
DCPCUP-0000-01418
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Dane County Zoning Administrator - January 20, 1998 2. <br /> The available area for groundwater will be reduced by the proposed operation. However, the loss of <br /> groundwater recharge potential could be offset somewhat by retaining the depression intact to promote <br /> recharge. <br /> vS/Ve therefore recommend that the basin remain intact during operation and that it be shaped and <br /> sloped during subsequent reclamation to function as an ephemeral pond. We would also advise that <br /> the excavation not intercept the water table as this would likely necessitate more extensive and costly <br /> measures to control site runoff. <br /> Thank you for allowing me to comment on this project and please see that my comments are made a <br /> part of the record. <br /> Sincerely, / <br /> --4144p <br /> onald E. Grasshoff <br /> 4 . <br /> Water Management Specialist <br /> Telephone: (608) 275-3228 <br /> Crymin <br />
The URL can be used to link to this page
Your browser does not support the video tag.