Laserfiche WebLink
DANE COUNTY LAND CONSERVATION 5 6082243745 09/14/98 00:17 5 :02/03 NO:871 <br /> FILE COPY CO <br /> ;;"-�`� LAND CQ1�iSE�R ATIpNNTY <br /> DEPARTMENT <br /> 41 t �/ FEN OAK <br /> RESOURCE aNTER <br /> 1 Fen Oak Cr.,Rm.708,Madison,Wisconsin 33718-8812 <br /> PH:608/2243730•FAX 608/224-3743 <br /> D ATE: September 11, 1998 <br /> TO: Jim Gregoriu.: <br /> Zoning Admi iistrator <br /> — <br /> FROM: Aicardo Roa, Ph.D <br /> Urban Consei vati. <br /> 112: �. E P 3-42 <br /> T.i e submitted Erosion Control Plan meets the needs of the site. <br /> 1. The plan includes a cc instruction schedule as follows: <br /> Soil loss calculations <br /> Grading and c instruction is planned to begin March 15, 1999. <br /> Finish grading shall be completed by approximately June 15, 1999. <br /> Establishment of the vegetative cover from 15 to August 15, 1999 <br /> 2. The plan also includes detailed information of the steps to reduce sediment according to <br /> the 7.5 ton/acre soil lc ss standard. <br /> 3. The plan has a provision that maintains existing grass, seed and mulch in the disturbed <br /> areas. The plan contaii is schedules for construction to ensure that the minimum sediment <br /> will be leaving the site during construction. The erosion control plan, as proposed, does <br /> not exceed 7.5 tons/acre/year, which is consistent with the county soil erosion standard_ <br /> 4. To prevent mud tacking or sediment onto the State Blghway 188 or Kehl Road, driveway <br /> pads are required durir.g the construction period. The pads will be 10 feet wide, 615 feet <br /> long, and a thickness o r6 inches of 4 to 6 inch crushed stone. <br />