Laserfiche WebLink
DANE COUNTY LAND CONSERVATION Ts. 6082243745 09/14/98 00:17 5 :03/03 NO:871 <br /> 1 <br /> 5. The final job appr oval of the sediment basin and erosion control measures needs to be <br /> submitted in writi ig to the Zoning or Land Conservation Department by the engineer that <br /> prepared the erosion control plan stating that the plan has been followed and executed. <br /> A copy of the Erosion Cc ntrol Plan must be given to the general contractor and the <br /> superintendent of the site must be aware of the plan for implementation. <br /> The construction site will follow the plan according to the schedule approved by Dane County <br /> Land Conservation. <br /> Alt:aw <br /> cc: Dave Lorenz <br /> Mark Poynnonen, Birrenkott Surveying <br /> • <br /> 2 <br />