|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-0000-01447
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
CUPS 00001-02383
>
DCPCUP-0000-01447
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2015 11:13:58 AM
Creation date
12/4/2015 11:13:43 AM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
01447
Town
Westport Township
Section Numbers
5
AccelaLink
DCPCUP-0000-01447
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br /> • <br /> . NOW, THEREFORE, in consideration of the terms and covenants contained in this <br /> agreement the parties agree as follows: <br /> 1. Description of Premises. The legal description of the Property to be used as the <br /> 8.9 <br /> quarry is attached to this Agreement as Exhibit A and o anticipate to <br /> There shall be approximatminely <br /> acres in size with 23 acres subject to mineral extractio n p era <br /> setback from the perimeter of the Property as shown on Sheet "D" the approved plans where <br /> no mining will occur. <br /> 2. Use. The mineral extraction operations to be c from the the Prope shall <br /> include the removal of rock, gravel, sand, or any other minerals <br /> excavating, stripping or leveling. These operations include�re reasonable sorting,accessory <br /> hung (with for <br /> mineral extraction, including, but not limited to, blastinag, l <br /> settling basins) stockpiling and sale of aggregate material. <br /> 3. Term. The initial term of the CUP granted by Dane County the CUP is shall not <br /> by Dane <br /> thirty (30) years. This Agreement shall commence on the date thirty D ) <br /> County (the "Commencement Date") and shall continue te�10 for <br /> terms of long(30) <br /> (1) <br /> years, and shall be automatically renewed for succeeding <br /> ( ) 5 <br /> the CUP is in effect, (2) there is no uncured default existing at the time the CUP renewal is <br /> either applied for or is granted by Dane County, and (3) the Operator has not engaged in a <br /> flagrant or repeated violations of the terms of this Agreement orhe CUP ndu with the prior <br /> term. This Agreement shall be reviewed by the Town Boar in c <br /> provisions of sections 10 of this Agreement to insure compliance with <br /> at least every <br /> Town <br /> Board is encouraged to review compliance with the teinis g least three (3) years. The quarry is anticipated to be opened for approximately thirty (30) years, <br /> given current market conditions. <br /> v <br /> 4. Descrinti n of O•erati•n . The quarry will be used to produce aggregate <br /> mineral products for various purposes, including, but not limited to, and otion of <br /> deni dings <br /> and roads. The quarry operations will consist of: (a) removing topsoil <br /> P e for the u <br /> forii� berms at the perimeter of the quarry f rose of noise reduction, landscaping and <br /> reclamation, (b) blasting to loosen rock from the quarry wall, (c) crushing_ of the rock into <br /> sized material to meet government and private contractor specifications,rhed rock and <br /> appropriately <br /> washing crushed rock to meet those same specifications, (e) stockpiling selling <br /> other aggregate in accordance with appropriate size and physical characteristics,activities. <br /> and hauling the crushed rock and aggregate from <br /> Jude earthmovers bulldozers, loaders, <br /> Equipment to be used in the quarry operations <br /> scrapers, trucks, rock drills, blasting equipment, conveyors, dewatering pumps, primary, <br /> n <br />
The URL can be used to link to this page
Your browser does not support the video tag.