|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-0000-01447
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
CUPS 00001-02383
>
DCPCUP-0000-01447
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2015 11:13:58 AM
Creation date
12/4/2015 11:13:43 AM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
01447
Town
Westport Township
Section Numbers
5
AccelaLink
DCPCUP-0000-01447
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
secondary, and tertiary crushers, sizing and washing equipment, seismographic d dir of <br /> monitoring equipment and scales. Stockpiling shall only be allowed in P <br /> the Property.he Pro e . Specific operations related to this general plan of operations are described as <br /> follows: <br /> A. Blasting. Prior to commencement of any <br /> blasting after the issuance of <br /> ngs, structures <br /> the CUP, the Town shall at the request of Operator,xhibit 'CBalattacheld hereto and made <br /> and wells within the "affected area" as shown on <br /> a part hereof. The inspections shall be conducted by rode independent All ent qual fied inspectors <br /> agreeable to the Town selected and paid for by Operator. <br /> in strict accordance with the State of Wisconsin on sin red oltio quarry and will be <br /> No <br /> undertaken by licensed blasters. No explosives shall be <br /> blasting will have peak particle velocity which exceeds 0.2 inches per second <br /> Blasting when <br /> measured in accordance with <br /> of 8ea.m�Wansd 4 p1mblMonday trreugh Friday. No <br /> only occur bcr�veen the hours <br /> blasting will occur on Saturdays, Sundays or legal holidays. Records of blasting shall <br /> be provided to the Town. No flock will leave the Property. <br /> B. <br /> Damage Claims. Any damage caused by quarry operations to buildings, <br /> structures and wells located within the Affected Area, shall C,fb subject to compensation <br /> by Operator in accordance with the procedures of subsection <br /> C. Claims Procedures. Any damage to buildings, structures and wells <br /> located within the Affected Area caused by blasting or from quarry u p,rations shall be <br /> compensated by Operator in accordance with the following p o <br /> (i) Any claim for damage shall be presented to Operator in written <br /> form, with a sworn certification, estimate of damage, and request for <br /> payment. <br /> (ii) Operator shall have the right to inspect the building, structure or <br /> well to determine whether, in its own good faith judgment, the damage was <br /> caused by quarry operations or blasting. <br /> (iii) In the event of a good faith dispute, <br /> Operator shall post 125% of <br /> the amount of claimed damage with a bank identified by the Town and the <br /> matter shall be referred to the University of Wisconsin-Madison Department of the of <br /> Geological Sciences or other qualified neutral party for <br /> Such determination shall <br /> cause of the damage claimed by the property <br /> be P romptly rendered after presentation. Operator shall pay thnc blast claim <br /> g <br /> five (5) business days of decision if the decisionm e <br /> or quarry operations caused the damage. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.