Laserfiche WebLink
9. <br /> Dane County proposes to remove the remainder of the clay from this parcel during <br /> 1996. Clay extraction will begin as early as possible in the Spring of 1996. Scrapers <br /> will be used to remove and stockpile the overlying topsoil. The clay materials will then <br /> be excavated and transported directly across Cross County Road to the landfill site. <br /> Once the project is completed, the borrow area will be regraded. The topsoil will then <br /> be replaced and the land restored for future use. <br /> Access from the site will be directly across Cross Country Road into the northeast <br /> corner of the Verona Landfill. Access roads and the portion of Cross Country Road <br /> being traversed will be maintained as necessary by Dane County. At the end of the <br /> 1995 construction season, Dane County Public Works repaved the section of Cross <br /> Country Road where heavy equipment was crossing over to the landfill. <br /> The majority of the adjacent land is agricultural or else part of Badger Prairie Park. <br /> Only two single family residences are located on this section of Cross Country Road. <br /> The parcel is approximately 1/2 mile south of several residential developments located <br /> near CTH PD. <br /> The final topography of the parcel will be somewhat modified. Pits will not be <br /> developed and steep side slopes will not be created. Drainage and erosion control <br /> measures will be taken to prevent siltation of nearby water conveyances. <br /> If you have any questions regarding this matter, please call me at 266-4139. <br /> Sincerely, <br /> DANE COUNTY PUBLIC WORKS DEPARTMENT <br /> 04, <br /> Allan Cz holinski <br /> Solid Waste Engineer/Hydrogeologist <br /> S C P as C u , /2-CCj CUP 9ss <br /> C 1 4 a , U .. a5 C / z C P SrJ <br />