|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-0000-01414
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
CUPS 00001-02383
>
DCPCUP-0000-01414
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2016 11:08:09 AM
Creation date
2/5/2016 11:00:21 AM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
01414
Town
Cottage Grove Township
Section Numbers
30, 31
AccelaLink
DCPCUP-0000-01414
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Description of Borrow Excavation Operation: <br /> Hoffman Construction Company proposes to obtain the required fill material from the <br /> south east facing slope of the existing hill on the property, starting at the Highway 12/18 right of <br /> way, extending south to the existing houses on Hope Hollow Trail off CTH AB. The access road <br /> will be located on Highway 12/18 as shown on the site drawings, and no material will be hauled <br /> on Hope Hollow Trail or CTH AB. <br /> The project on Highway 12/18 and IH 90 requires 220,000 of borrow excavation in the <br /> 1997 construction season and 200,000 cubic yards of borrow excavation in 1998. <br /> Erosion Control: <br /> Erosion control on the site shall follow the Wisconsin DNR Best Management Practices <br /> and all Wisconsin DOT requirements. Erosion control shall be installed per the attached site <br /> plan. The erosion contol plan will meet the requirements of Dane County ordinance 14.54, and <br /> will be approved by the Dane County Land Conservation Committee prior to any work on the <br /> site. These sheets detail the erosion control consisting of temporary and permanent seeding, silt <br /> fence, settling basins, tracking pad, and ditch dikes. <br /> During construction, interim erosion control devices such as silt fence, erosion bales, <br /> erosion mat, and ditch checks will be utilized to control any erosion. The site will be monitored <br /> daily and after any rainfall. The erosion control devices shall be supplemented or corrected if <br /> any deficiencies are noted. <br /> Construction sedimentation basins will be constructed as shown to control runoff. The <br /> construction basins will consist of a settling basin capable of holding the volume required by the <br /> Dane County Ordinance 14.54, and an overflow filter consisting of 6" minus rock faced with a 1" <br /> washed stone filter. These erosion control devices are shown on the attached plans. <br /> Topsoil dikes and silt fence will be constructed around the perimeter of borrow sites, and <br /> sites will be seeded, fertilized and mulched as soon as possible. The topsoil stripping piles shall <br /> be placed to direct any runoff to the settling basins. <br /> Temporary slopes will have silt fence placed at the bottom to contain erosion and <br /> siltation, and will be temporaily seeded as directed by the state project engineer. The exact <br /> locations of temporary erosion control devices can be found in the site plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.