|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-0000-01414
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
CUPS 00001-02383
>
DCPCUP-0000-01414
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2016 11:08:09 AM
Creation date
2/5/2016 11:00:21 AM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
01414
Town
Cottage Grove Township
Section Numbers
30, 31
AccelaLink
DCPCUP-0000-01414
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Traffic Control: <br /> Traffic Control shall include advance warning signs placed both east and west of the <br /> borrow pit entrance during work hours. The advance warning signs will be spaced at 500' <br /> intervals and will include: Road Work Ahead, Be Prepared to Stop, and Flagperson Ahead. A <br /> temporary entrance permit will be obtained from the Wisconsin DOT prior to any site work. <br /> Schedule of Operations: <br /> Work on the site will begin in late March 1997. The 1997 construction area will be <br /> stripped of topsoil and placed in a berm at the bottom of the borrow area. At this time, the <br /> sediment basins and erosion control devices will be constructed. By September 15, 1997 <br /> approximately 1/2 to 3/4 of the 1997 construction area will be restored with topsoil, seed, <br /> fertilizer, and mulch. At the end of the construction season, by late November 1997, the <br /> remainder of the stripped area will be restored with topsoil and temporary seed. In April of 1998, <br /> the 1998 construction area will be stripped of topsoil. Excavation will continue in this area <br /> through August of 1998. By September 1, 1998, the entire area will be reclaimed to its final <br /> condition. This will include seeding, fertilizing, and mulching of any disturbed area, removal of <br /> the temporary driveway, and any final erosion control measures to prevent erosion from the site. <br /> Dust Control: <br /> A water truck will be on site at all times for dust control on the haul roads and adjacent <br /> roadways. In addition, a power broom will be located on the projects, and will be used to clean <br /> Highway 12/18 of any mud and debris that is tracked onto the road. <br /> Fueling of Vehicles: <br /> Vehicles will be fueled at an area away from the Little Door Creek. Trucks for hauling <br /> will be fueled at an area away from the site. The only equipment to be fueled at the site will be <br /> the excavating equipment, and this will be performed on areas of high elevation with soil ground <br /> cover. <br /> Property Security: <br /> To prevent unauthorized access to the site, a fence and locked gate will be placed at the <br /> entrance to the site along highway 12/18. In addition, the site will be marked with No <br /> Trespassing signs to prevent public access to the site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.