Laserfiche WebLink
Introduction: <br /> Hoffman Construction is applying for a conditional use permit for mineral extraction on <br /> the Carl Rattman property in Sec. 30, T7N, R11E, in the Town of Cottage Grove, Dane <br /> County. Hoffman Construction Co. is a highway grading contractor and has been <br /> awarded the Hwy 12/18- IH 90 Interchange reconstruction project with the Wis. D.O.T. <br /> As part of this work, approximately 420,000 cubic yards of borrow excavation (fill dirt <br /> coming from outside the right-of-way) is required for the project. The project will begin <br /> in late March, 1997 and will be complete in September, 1998. <br /> In addition, the Wis. D.O.T. is scheduled to let for bids reconstruction of the Badger <br /> Interchange (IH 90/94 & Hwy 30) in Feb. 1997 which requires 30,000 cubic yards of <br /> borrow excavation and Hwy 12/18 from IH 90 to Northstar Road (east of C.T.H. N) in <br /> March 1997 which requires 65,000 cubic yards of granular backfill for marsh pre-loading. <br /> Hoffman Construction proposes using the Carl Rattman property as herein described for <br /> obtaining the required borrow excavation for Wis. D.O.T. projects. <br /> Description of Borrow Excavation Operation: <br /> As shown on the attached site drawings, Hoffman Construction Co. proposes to obtain <br /> the required fill material from the south east facing slope of the existing hill on the <br /> property, starting at the Hwy 12/18 right-of-way, extending south to the existing houses <br /> on Hope Hollow Trail, off C.T.H. AB. The only truck access will be via Hwy 12/18 <br /> directly. No material will be hauled on Hope Hollow Trail, or C.T.H. AB. The access <br /> road will be located on Hwy 12/18 as shown on the site drawings and will be protected by <br /> tracking pads and traffic control as herein described. <br /> The project on Hwy 12/18 and IH 90 requires 220,000 of borrow excavation in the 1997 <br /> construction season and 200,000 cubic yards of borrow excavation in 1998. The Badger <br /> Interchange project and the Hwy 12/18 project to Northstar Road require borrow <br /> excavation in 1997 only. Our plan is to only open no more than 1/2 of the borrow pit at a <br /> time. The sequence of operations is as follows for both the 1997 and 1998 excavations: <br /> - Install erosion control devices <br /> - Strip topsoil and stockpile at perimeter of excavation <br /> - Excavate and haul material to project site via Hwy 12/18 <br /> - Replace topsoil and reseed disturbed areas <br /> The material will be excavated by backhoes and hauled to the IH 90 12/18 and Badger <br /> Interchange projects with trucks. Only the material for the marsh preloads directly <br />