adjacent to the borrow pit will be hauled with scrapers. All cut slopes shall be restored at <br /> a 3H:1 V or flatter slopes. There shall be a minimum 25 foot set back from property lines <br /> except at the Wis. D.O.T. right-of-way where the excavation will cross the property line <br /> and some material will be excavated on the right-of-way. A total of approximately 15 <br /> acres will be used for the excavation, access road, and settling basins. Scheduling, <br /> erosion control, and traffic control are as stated below. <br /> Schedule of Operations: <br /> Work on the site shall begin in late March 1997. The erosion control devices including <br /> construction of an access road and tracking pad, settling basin, and silt fence shall be <br /> installed before construction (see attached drawings). The 1997 excavation shall <br /> continue throughout the summer of 1997 and be complete including restoration by late <br /> November 1997. The 1998 excavation shall begin in April 1998 and be complete and <br /> the site restored by September 15, 1998 in accordance with the restoration plan. <br /> Daily work hours shall be between 6:00am and 8:00pm, Monday through Saturday. Most <br /> work shall occur between the hours of 6:30am to 6:00pm Monday through Friday with <br /> occasional Saturday work. <br /> Traffic Control: <br /> Traffic Control shall include advance warning signs placed both east and west of the <br /> borrow pit entrance during work hours. Please refer to the enclosed detail showing exact <br /> sign location and spacing. The advance warning signs shall be spaced at 500' intervals <br /> and include: <br /> Road Work Ahead <br /> Be Prepared to Stop <br /> Flagperson Ahead <br /> A temporary entrance permit is required from Wis. D.O.T., Dist. #1 for access to Hwy <br /> 12/18. This will be obtained by Hoffman Construction prior to any site work and all <br /> conditions placed on the permit shall be followed. <br /> Flagpersons shall be used as warranted in order to create safe entrances and exits to Hwy <br /> 12/18. At this time, only Hwy 112/18 westbound would be controlled by a flagperson; <br /> however, this may change during construction if directed by the Wis.D.O.T. engineer for <br /> safety reasons. In any case, the flagpersons on Hwy 12/18 will not stop traffic, merely <br /> slow traffic to create gaps to enter the highway. As stated in the Wis. D.O.T. contract, <br /> Hoffman Construction cannot interrupt the free flow of traffic on Hwy 12/18. <br />