Laserfiche WebLink
Page 2 <br /> CONDITIONS <br /> These conditions are specifically made applicable to this permit, <br /> any violation of such conditions shall be sufficient grounds for <br /> revocation of this permit. <br /> 1 . The applicant shall submit an erosion control plan <br /> covering the entire CUP area for the duration of <br /> operations, and receive approval of an erosion control <br /> permit prior to commencing extraction operations . <br /> 2 . The applicant shall apply for and receive all other <br /> required local, state and federal permits, including <br /> but not limited to a zoning permit from the Zoning <br /> Division. <br /> 3 . Reclamation shall be completed within one year <br /> after operations have ceased, and shall follow the <br /> applicant' s submitted "Restoration Plan" as stated in <br /> the application and as shown on the drawings submitted <br /> with the application. The operator shall post and <br /> maintain at all times during the term of the CUP a <br /> bond in favor of the County in the amount of $15, 000 <br /> payable to Dane County to ensure compliance with the <br /> reclamation plan. <br /> 4 . To prevent unauthorized access to the site, a fence <br /> and locked gate will be placed at the entrance to the <br /> site along highway 12/18 . In addition, the site will <br /> be marked with Noo Trespassing signs to prevent public <br /> access to the site. <br /> 5. The operator shall maintain the haul road in a dust <br /> free manner in accordance with local, state, and <br /> federal regulations . <br /> 6. Hours of operation, shall be from 6: 00 a.m. to 6: 00 <br /> p.m. , Monday through Friday, and from 8 : 00 a.m. to <br /> 1 : 00 p.m. on Saturdays . No operations of any kind <br /> shall take place on Sundays or legal holidays . Hours <br /> of operation may be temporarily extended for special <br /> circumstances, but only after approval by the Town <br /> Board. <br /> 7 . There shall be no crushing, screening, blasting or <br /> drilling on the site. <br /> 8 . The operator shall spray the site with water if and <br /> when needed to control dust. The need to spray may be <br /> determined by the Zoning Administrator if he/she <br /> determines it is necessary. <br />