|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-0000-01243
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
CUPS 00001-02383
>
DCPCUP-0000-01243
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2016 1:18:53 PM
Creation date
2/25/2016 1:18:51 PM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
01243
Town
Verona Township
Section Numbers
27
AccelaLink
DCPCUP-0000-01243
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. . <br /> . . <br /> . irk A <br /> YAHARA MATERIALS, INC. <br /> 6117 C.T.H. "K'/ROUTE 1 <br /> WAUNAKEE,WISCONSIN 53597 <br /> PHONE 608-849-4162 - FAX 849-5062 <br /> AN EQUAL OPPORTUNITY EMPLOYER <br /> January 23, 1995 <br /> To Whom It May Concern <br /> Town of Verona/Dane County <br /> Yahara Materials, Inc. requests a Conditional Use <br /> Permit to locate a temporary concrete batch plant on the <br /> Ronald Gust property described as follows: <br /> Less than 5 acres in the <br /> NE 1/4 NE 1/4, Sec. 27, T. 6N, R. 8E. <br /> Town of Verona, Dane County, Wis. <br /> Located south of USH 18 and CTH "M" <br /> and west of Range Trail <br /> The site will be used for construction of the Verona <br /> Bypass in the 1995 construction season. Topsoil will be <br /> stripped from the site and stockpiled along the margins for <br /> future reclamation. Access to the site will be from Range <br /> Trail and access to the construction zone will be by a <br /> temporary roadway. The site will be graded to a regular <br /> contour and base course added to support equipment and <br /> vehicles. Aggregates will be trucked to the site and <br /> stockpiled for inclusion in the concrete. A well will be <br /> drilled along the north side of the site to supply water to <br /> the concrete batch plant. <br /> At the cessation of operations all foreign material <br /> will be removed from the site and it will be graded to it's <br /> original contour. Topsoil will be graded over the site and <br /> it will be returned to crop land. The site will be <br /> completely reclaimed by the end of the 1995 construction <br /> season. <br /> Respectfully submi -d, <br /> ahara rials, Inc. <br /> Larry Bur alow, President <br /> za <br /> yiAtILL:t., thLg..0..AAJ,1 <br /> • <br /> )6,a2. .._.31hitk._ <br />
The URL can be used to link to this page
Your browser does not support the video tag.