|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPREZ-0000-05889
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
DCPREZ-0000-05889
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/29/2016 4:11:42 PM
Creation date
2/29/2016 4:11:35 PM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
Rezone
Petition Number
05889
Town
Westport Township
Section Numbers
23, 26
AccelaLink
DCPREZ-0000-05889
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DANE COUNTY <br /> LAND CONSERVATION DEPARTMENT <br /> FEN OAK RESOURCE CENTER <br /> ' ' 1 Fen Oak Ct.,Rm.208,Madison,Wisconsin 53718-8812 <br /> acorn_: PH:608/224-3730•FAX:6081224-3745 <br /> R I"// <br /> DATE: April 9, 2002 e545--- 3 ? -a6 <br /> TO: Tim Gregorius <br /> Zoning Administrator <br /> FROM: Aicardo Roa, Ph.D. 56 `7 s h ( i b`e l l <br /> Urban Conservatio•' _n E„' <br /> 3.r. bc ," <br /> RE: Westport Condomini s- 'CP#2-759 r <br /> Town of Westport ' // <br /> The submitted erosion control and stormwater plan does meet the needs of the site and the SSE j <br /> requirements of the Dane County Erosion Control and Stormwater Ordinance. <br /> !-J. czt,et <br /> The erosion control and storm water plan presents separate hydrologic calculations and erosion <br /> control plans for each sub-area. <br /> The following requirements will be implemented: <br /> Time schedule: <br /> DAB _ACTIVITY <br /> May 15, 2002 Build the retention pond, place and install erosion control measures, <br /> mud tracking pads, outfall riprap, outlet control with stand pipe for <br /> permanent reduction for quality control at the outlet structure for <br /> the 2-yr. storm, start grading the construction site, cut and fill, finish <br /> grading, seed and mulch. <br /> July 15, 2002 Topsoil 4 to 6-inches, seed and mulch disturbed areas and side <br /> slopes and restoration as needed. Final stabilization. <br /> September 15, 2002 End of stabilization period. <br /> Erosion control measures: <br /> 1. The disturbed areas will be seeded at a rate of 7-pounds per 1,000-sq. ft. within 7 days of <br /> completing grading operations. Planting dates are May 1 to May 31 for the spring and <br /> September 15 for the last day in the fall. <br /> 2. Fertilizer shall be applied at a rate of 5-pounds/1,000 sq. ft. of 20-10-10 (NPK). <br /> 3. Mulch the site with 1.5 to 2-tons or 80-pounds/1,000 sq. ft. <br />
The URL can be used to link to this page
Your browser does not support the video tag.