4.6.6.Placement will require cabling of installed logs and rootwads to snags, boulders and <br /> deadman anchors. Cables must be installed on bare wood surfaces, double wrapped and <br /> pulled tight as shown in the plans. <br /> 4.7. To facilitate efficient movement of logs,the Contractor shall provide a track excavator with a <br /> hydraulic thumb attachment. <br /> 4.8. Large wood will be placed and ballasted according the Drawings and the direction of the <br /> Engineer. Ballast will consist of burial and embedment into soil, backfill with soil, boulder <br /> placement, and cabling to other logs, buried Snags and buried Deadman anchors. <br /> S. PLANTING <br /> 5.1. Planting of native grass,forb and shrub species will take place above the predetermined lower <br /> limit for vegetation, in areas designated in the plans. A mixture of species with varying moisture <br /> tolerances is recommended to ensure survival. <br /> 5.2. The species lists contain plants native to the project area and that thrive in riparian <br /> environments. These lists may change based on availability of plant materials. Additional <br /> native species may be added, but must be approved by the project owner. <br /> 5.3. Native grasses and forbs will be planted from seeds hand or mechanically sown and <br /> incorporated at a density of 30-50 pounds per acre.The native grass community is designed for <br /> immediate erosion control in all excavated areas, and is considered temporary until natural <br /> succession occurs. <br /> 5.4. Native floodplain trees and shrubs in the immediate riparian zone will be planted as potted <br /> stock, and will be installed using a clumped planting plan based on numbers calculated from an <br /> 8 ft grid pattern. <br /> 5.5. Upland trees and shrubs will be installed following random placement based on a clumped plan <br /> calculated from a 25 ft grid density. <br /> 6. MEASUREMENT AND PAYMENT <br /> 6.1. Excavation -Work for items 'Excavation, reused on site' and 'Excavation, removed from site' <br /> shall include, but is not necessarily limited to surveying, all operations in connection with wet <br /> and dry soil grading, pilot channel excavation,trenching,temporary crossings,filling of <br /> dewatering channels, hauling and disposal of cut, haul road construction and maintenance, <br /> temporary wetland mat placement, site access and staging, and common fill placement as <br /> shown within the Plans.This item includes supplying all materials, equipment, labor and <br /> incidentals to complete this work. Excavation will not be measured. Payment for these items <br /> will be based on the approximate quantities for excavation to the lines and grades shown on <br /> the Plans. If the engineer directs excavation to stop above the lines and grades shown in the <br /> plans, dimensions will be surveyed and payment may be modified based on an adjusted <br /> quantity. <br /> 6.2. Log Placement-Work for this item shall include, but is not necessarily limited to all operations <br /> in connection with log installation as shown within the Plans and as directed by Resident <br /> Project Representative. Measurement and payment per log. <br />