Laserfiche WebLink
On Nov 9, 2015, at 5:41 PM, Reimer, John<Reimer.John@countyofdane.com>wrote: <br /> Jim, <br /> Took a quick look. Here are my preliminary comments; though there may be more once I or someone <br /> else spends more time reviewing: <br /> 1. I do not see any specific erosion corhtrol measures identified on the plans. <br /> 2. Show the construction phases on the plan. <br /> 3. Please provide the information for existing/proposed modeling results. <br /> 4. USLE worksheet can be found here: <br /> https://Iwrd.countvofdane.com/wred/documents/Tools/usle22.xls <br /> 5. Financial security: If not check money for the financial security then a letter of credit can be <br /> used: Example document here: <br /> https://Iwrd.countvofdane.com/wred/documents/Forms/exampleLOC.pdf <br /> John Reimer, PE <br /> Stormwater Engineer <br /> Dane County Water Resources Engineering Division <br /> Phone: (608) 224-3612 <br /> From:JAMES T ADDIS [mailto:limaddis @icloud.com] <br /> Sent: Monday, November 09, 2015 6:28 PM <br /> To: Marty Melchior <br /> Subject: Erosion Permit <br /> I forwarded the comments from John Riemer,the watershed engineer who may be reviewing our <br /> permit. They cannot accept the application until the construction details that are going out for bid are <br /> finished and the spreadsheet he attached a link to are complete. They will use the specifics in the plans <br /> to conduct their onsite inspections. I assume that your engineer is creating the documents that will be <br /> needed. <br /> I have attached their Universal Soil Equation Worksheet. <br /> If we get the material to them in late Novenber or early December he thinks that their turn around on <br /> the permit will be about 15 days. <br /> I will await the final design details. I hope you two weeks in Boston are productive. <br /> Jim <br /> Jim Addis <br /> Madison,WI <br /> 608-244-3103 <br />