• <br /> CONDITIONAL USE PERMIT #717 <br /> CONDITIONS <br /> 1. Hauling shall be on USH 12-18 to the Landfill. <br /> 2. Hauling shall be limited to one season. <br /> 3. Approximately ten acres of land will be opened up for clay extraction at <br /> one time. When the excavation is complete on the first ten acres, the <br /> next ten acres will be stripped of topsoil. That topsoil will then be <br /> placed on the first ten acres stripped. This procedure will then be <br /> repeated for the following acres. After the topsoil is replaced, it will <br /> be graded and seeded. <br /> 4. Soil erosion control measures will be required and enforced. Siltation <br /> fences will be constructed as required. <br /> 5. Hours of operation shall be 6:30 a.m. to 5:30 p.m. Truck hauling will be <br /> limited to 7:00 a.m. to 4:00 p.m. The intent is that work days shall be <br /> Monday through Friday with the exception of an occasional Saturday for <br /> rain make-up. <br /> 6. A good faith effort will be made to leave several inches of clay on <br /> site. Surface of topsoil will be prepared prior to seeding such that <br /> roots could be established. <br /> 7. The land will be kept in grassland/hay production for an initial five <br /> year period to allow soil structure to become re-established, and to <br /> assure no harmful effects to area groundwater. <br /> 8. After this initial period, the reintroduction of a more intense land use <br /> such as row-crop agriculture may be allowed based on soil test results <br /> and committee approval. <br /> 9. The Town Board will be notified of any requested changes in land use. <br /> 10. Soil testing shall include remapping based on soil borings. In addition, <br /> test plots shall be done to determine yields on the rebuilt soil so <br /> future nitrogen can be closely tied to yield expectations. <br /> 11. Land use must follow State standards for nutrients and pesticides <br /> currently being set by the U.W. , State and Federal agencies. (These <br /> standards will be in effect before a petition for a land use change can <br /> be made, and they will establish specific soil series application rates <br /> for agricultural chemicals for the entire State of Wisconsin) . <br /> 12. All construction equipment and vehicles will be fueled and stored on land <br /> that has not had the clay removed. Farm equipment will also be stored <br /> and fueled on land that is not disturbed. <br /> 13. Once the clay has been excavated, the borrow area will be regraded to <br /> match the original topography and drainage patterns. Sandy loam subsoil <br /> materials will be backhauled from the Landfill to replace the excavated <br /> materials. <br /> 14. Clay extraction will be limited to the deep, low-lying soils in the <br /> valley bottom. The steep, adjacent side-slopes will not be excavated. <br />