|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-0000-01132
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
CUPS 00001-02383
>
DCPCUP-0000-01132
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2016 10:41:38 AM
Creation date
3/4/2016 10:41:33 AM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
01132
Town
Cottage Grove Township
Section Numbers
33
AccelaLink
DCPCUP-0000-01132
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
/ P�/3� <br /> CO I FO1j,-RE OVAL-10F, L'$T A jeAsyoupypisrm, <br /> 1. Hauling will be on USH 12-18 to the Landfill. <br /> i b mit A.Adakrii-tcl--entNg_ea <br /> Approximately ten acres of land will be opened up for clay extraction at one time. <br /> When the excavation is complete on the first ten acres, the next ten acres will be <br /> stripped of topsoil. That topsoil will then be placed on the first ten acres <br /> stripped. This procedure will then be repeated for the following acres. After the <br /> topsoil is replaced, it will be graded and seeded. <br /> N,E-3. Soil erosion control measures will be required and enforced. Siltation fences will <br /> be constructed as required. <br /> Hours of operation will be 6:30 a.m. to 5:30 p.m. Truck hauling will be limited to <br /> x_m „ >00 a.m. to 4:00 p.m. The intent is that work days shall be Monday through Friday <br /> with the exception of an occasional Saturday for rain make-up. <br /> A good faith effort will be made to leave several inches of clay on site. Surface <br /> of topsoil will be prepared prior to seeding such that roots could be established. <br /> 6 The land will be kept in grassland/hay production for an initial five year period <br /> to allow soil structure to become re-established, and to assure no harmful effects <br /> to area groundwater. <br /> 7 After'this initial period, the reintroduction of a more intense land use such as <br /> row-crop agriculture may be allowed based on soil test results and committee approval. <br /> rThe Town Board will be notified of any requested changes in land use. <br /> 1. Soil testing shall include remapping based on soil borings. In addition, test plots <br /> shall be done to determine yields on the rebuilt soil so future nitrogen can be <br /> closely tied to yield expectations. <br /> j1 . Land use must follow State standards for nutrients and pesticides currently being <br /> set by the U.W. , State and Federal agencies. (These standards will be in effect <br /> before a petition for a land use change can be made, and they will establish <br /> specific soil series application rates for agricultural chemicals for the entire <br /> State of Wisconsin. ) <br /> All construction equipment and vehicles will be fueled and stored on land that has <br /> not had the clay removed. Farm equipment will also be stored and fueled on land <br /> that is not disturbed. <br /> idt0 e the lay has be: ' exca ated, se borrow area '1l be -gra. -. to ' .tc, th= <br /> • ,g al t.... .phy ano dr-i age pa.terns • -nd 1.am ub-.i ma e a w 1 .: <br /> sac h_ _ ed 'om . .- Lan. ill - repla ; e ex . ated materia . <br /> Clay extraction will be limited to the deep, low-lying soils in the valley bottom. <br /> The steep, adjacent side-slopes will not be excavated. <br /> 2/28/89 <br />
The URL can be used to link to this page
Your browser does not support the video tag.