|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-0000-01166
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
CUPS 00001-02383
>
DCPCUP-0000-01166
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2016 3:34:56 PM
Creation date
3/15/2016 3:34:53 PM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
01166
Town
Rutland Township
Section Numbers
1
AccelaLink
DCPCUP-0000-01166
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• I .1- <br /> • Provide a buffer between the commercial use and any adjacent non- <br /> commercial use. <br /> • Not endanger the environment of the area. <br /> • Require a septic tank no larger than 1,450 gallons. The size of the <br /> septic tank system may be limited to a lesser amount at the Town <br /> Board's direction. <br /> Comment: Due to the uses permitted in the commercial zoning districts and <br /> the town's desire to limit the size of such operations, each rezoning will <br /> require a conditional rezoning to set specific limits. This also allows the town <br /> an opportunity to review any potential new or successive uses. <br /> 4. If a proposal meets the criteria of policy 3, a site plan to scale will be <br /> required, which must show at a minimum the following: <br /> • Access points to the highway; <br /> • Driveway and parking areas; <br /> • Building locations (existing and proposed); <br /> • Septic tank-soil absorption system location; <br /> • Screening from neighboring uses; <br /> • Lighting and drainage; <br /> • Justification for any excess lands proposed to be rezoned. <br /> • A statement of estimated traffic volume and peak traffic periods as a <br /> result of the proposed use. <br /> • Stormwater drainage and erosion control plans will be required. <br /> Comment: The Plan Commission may ask for additional information at their <br /> discretion. The site plan, when approved, will become part of the conditional <br /> rezoning. <br /> Resource Protection Policy <br /> 1. To identify and protect the unique natural resources such as: floodplains, <br /> wetlands and woodlands. <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.