F' R 3
<br /> t
<br /> 208.3 •i
<br /> 11 i
<br /> 5 percent of When special compaction of the embankment at the structwl ste i■sj tided h.-Ickfill
<br /> tall have the material placed below a plane six feet below the finished subgrade shall he compacted to
<br />`il those por- at least 90 percent of maximum density and backfifl material placed within ;ix fret i.if die
<br /> fi at least 90 finished subgrade shall be compacted to at least 95 percent of maximum density, except
<br /> 00 feet Of a as provided in Subsection 207.3.6 3 for bridge approaches.
<br />.tad Method 207,5 Finish Grading, The earth grade shall he trimmed, finished and maintained a4 .':
<br /> stion; T 99, specified under Roadway and Drainage Excavation, Subsection _U5 s 12
<br /> 4 inch sieve Rock, stone and boulders excavated by plowing and scarifyird' operations orid re- ,
<br />;aerial will he quirecl to be removed and disposed of will not be measured for p ayment
<br /> 5nil-in-Place a - e
<br /> 207.6 Compensation.The work prescribed in this section will not be mc; u� a ,,r paid
<br /> r approved for directly but shall be considered as subsidiarx work pertaining to and included in the r
<br /> several classes of Roadssay and Drainage Excavation, Borrow r xcavation, Ex ai,ation f
<br /> aggregate re- for Structures, Granular Backfill, and other items of work, The work shall include the
<br /> ty was deter- fur illation.compaction,shaping,sloping,trimming,finishing and maintaining of the cm- •
<br /> Department banknlcnty and all ocher work incidental thereto
<br /> kments eon ,
<br /> rcentages of SECTION 208. BORROW EXCAVATION
<br /> mei be accu•
<br /> iinSUr or in-
<br /> 208.1 Description. Borrow F.xcavation. or Selected Borrow Excavation; shall co,isist
<br /> t sections for
<br /> 01 furnishing. cxctlsating, hauling and placing approved material required for compie-
<br /> c compacted lion of embankments and other portions of the work when sufficient t quantities of sate:,- c
<br /> P factory material for such purposes cannot be obtained from withi.i the limits of Roadway t.
<br /> compaction and Drainage Excavation. Excavation for Structures Had other designated e7•,i.,it,on 1
<br /> required, the j and when such additional material is obtained from approved location,an s •:hoes pro-
<br /> a depth of at
<br /> vided by the contractor or from state-furnished sources outside the right-,,t w:+y !units of
<br /> Determina-
<br /> the project or prolccls included under the contract
<br /> x;in accord-
<br /> When author red by the engineer in writing, it may also t nsist c Y_I �.Ir• surplus
<br /> excavation thorn whet projects, or material from old road hi!. remJs ,..i in accr.or since
<br /> with the provisions of Section 214.
<br /> rg+tneer, VT
<br /> r xttlCrl�r,nt, 208,2 Materials.
<br /> h grade over 208,2.1 Quality. The material furnished tinder the item, Borrow £v.a,atIon. shall
<br /> consist of satisfactory sod or a mixture of iatistactm-v `oil. stone,gra.,e; ,ii nthu'acccnt-
<br /> 7n shown on able materials which is of a character and quality satisfacinry for i!:e purpnnse intended.
<br /> shall have all The material shall he free from sod,stumps.logos,grubs and other perishable and deieteri.
<br /> oth uniform nn
<br /> - matter
<br /> l he material furnished under the item, Selected Borr ss Exccevatioa, :;hail rrn r the
<br /> w;the desig• quality requirements specified at the contact.
<br /> oil will result 208,2.2 Source, Unless otherwise provided it: the caraiL;t h: cont,,ic i shi. at:•_
<br /> his own negotiations with property owners or others from vhctr he io•op os c bt: in }
<br /> borrow material,The remora l of the material and the final condition the pit snail he in
<br /> rig and corn- l I �f
<br /> accordance with the provisions of Subsection 104.9 and the icquirtments of Suh:,t°_tion
<br /> es, retaining ?SlR 1
<br /> funned ma-
<br /> 2118,.3 Construction Methods.The area from which mater 1,1i t.•;-Boa r 0',V Er ;,atuon.or rt
<br />•equirements Selected Borrow Excavation. is to he obtained shalt be cleared ant; giuhbcci in the same
<br /> manner as specified for Roadway and Drainage Excavation All sod or other perishable
<br /> kfilf shall he or unsuitable material shall he removed from the proposed pit area. Hot(ow pit;shall he
<br /> I
<br /> t
<br /> 1
<br /> r
<br /> f
<br />
|