Laserfiche WebLink
F 04 <br /> r. <br /> 208.3 <br /> 1 r�— cxcavutiat in ;r rrriiirie Lu per�uiL accurate rich iirerr?Col of the rn■itrrial excavated and <br /> Fertiliiln <br /> ruc:or poi utc'd rrr the work. <br /> broi e n rook.h„t; i rarely as pre <br /> Ids s and otht-r m i eri,ilS whr h trot not sa tist, tors.for use <br /> in the work shah he disposed of by the contractor at hp,,.*pets r,,ti spe,.il;Ci t:nd r Road- 208.5 By> <br /> way and DraMagc excavation the contract <br /> All stumps, trees- logs. brush. tops and other dehri' resulting troth,'Ir;rr ini'and ;nth- vatlon,as th <br /> hind; work in borrow pit areas shall he disposed of by the contractor as specified under rills, unless <br /> ('tearing arid (irubhing tramming, lc <br /> Except in the case of commercial pits, the available topsoil Or Other soil of a nature vidcd-comp <br /> conducive to plant growth. overt•>tnft such pit. shall he stripped oh and piaecc in truck trig,rebuild' <br /> piles in sufficient quantities to cover all surfaces of r'xcacared Areas siriilrt such 2:1 r,J a within horn <br /> depth of from four to six inches When the depth of to ;oil overlying such pit is less than piece the we <br /> tour inches in depth. the topsoil shall he replaced or the original depth. Aft"•r the' rid has i crlilizir. <br /> been trimmed and finished, such salxagcd material :hill 1--,' rJ if,,rrn'y sp. n'•er :;ail as provided <br /> excavated ,areas ;i1 the borrow pit, except as nthcrwrsc auihur reed i <br /> r,.,, the erignee7. rn <br /> '.5 r,nnt, <br /> Atter the escalated areas tit the pit have been 1(tps'uled Ili!'pit: disiicrh.;d areas aiiia- <br /> cent thereto and associated haul roads shall he ter'tr!lied a, pros;der! in Section r2)and <br /> seeded is provided in Section f,ttl, except when Irn rn: r rl si:-tm.,. is mil red in <br /> accordance s ith Subsection 30,3 3 a for st edin,, ho,r:,w n <br /> it, a ' w;sir 1r°'rs 209.1 De <br /> c <br /> In the eyrnr the contractor elects to place finrroa T?s,.:,vaoon. or `+ei t:'-;i Borro or selected <br /> Excavation, by hydraulic methods. written apprutial co.errng the nu tlrtY and sources of hackflline c <br /> the proposed material as well as the proposed construction methods must b c htatnest walls and o <br /> t room the engineer before such work can proceed yuired by t <br /> 21111.4 Method of 31easurement. Except to the ass of hydra it,i. hi!s Ft;,rn,s Excava- <br /> tion <br /> 209.2 M <br /> lion or Selected Borrow (xu•av;'ttion will he rr ea'.ur•.d tr cubic q; rSS of ',motile in its 209,2,1 <br /> original position. computed bx the method ot averages eriil 2re,is. ,v;th n ' colrCeti' n for <br /> curvature, or if the engineer elects, hx' the method of trnncare:l prisms The ;�:inrracrOr other ro of n <br /> shall notify the engineer sufficiently in advance of the titre when e cavation operations olhr.r bma: <br /> will he performed used ma: <br /> rmc•d su a. to permit accurate measurements of the borrow pit Sod or other <br /> used fvr ha <br /> unsui[al,te rn•.•_enrit rernuce(I. or mdiCrra!5■it1.,iyed from borrow pie=:;;n,d r;srh for cover- passes it six <br /> ing surCaccs of the cxca.a[cd areas within such pits.as here,nhef,,rc provided. will not be less than <br /> ntcri urcd Cur payment The eutyureer may require the e',n/rat:Lir to remove Irri' oil or <br /> • <br /> Other unsuitable materials from the surface of the pit area prior to taking original cross Cul would pier <br /> uld be r <br /> •• sections of the pit area and,upon completion of the excavation, to srnet;irh or trim the pit. The def <br /> as required,to permit taking accurate final measurements rat the area hefrii,tine topsoil is Either< <br /> replaced thereon.Any material excavated prior to the staking out and cross sectioning of conic;lets <br /> the burrow pit by the engineer,and all excavated material in excess of that required for or The ligi <br /> not IrlcorporaTer!in the work, will not be included in the quantity measured for payment, shall not b <br /> Where the quantity Of flctrreiw EXCiiV;itron nr Selected Borrow Excavation to be <br /> •I placed is of such a minor amount that in the judgement of the engineer the measurement 209.2.2 <br /> of such minor quantity by the above method would be impractical,the measurement may which pass <br /> y. <br /> 1 be made by the cubic yard in the vehicle.The capacity of each vehicle used for hauling the <br /> material shall be determined by the engineer to the nearest I;'10 cubic yard. <br /> / <br /> It the contractor elects or the contract requires the use of hydraulic methods for plat- No 4 <br /> ing embankments. Borrow Excavation or Selected Borrow F.xcavritinn will be roe: cured No. 4 <br /> in cubic yards or y.hrime nfcUrttpicted erTlbankmenl by the method ot average end areas. <br /> No. I <br /> with no correction for curvature.Such end areas will he determined f rom precor,:trrclion No. 2 <br /> Crr1SS sections of the area to he covered by the proposed embankment end cross sections <br /> of the completed work No allowances will be made for shrinkage, .a,h,i,+cncr, c-r lateral 209.2.3 <br /> movement of the material or for material in excess iii'h:'•t reciuirec'. t.-r�t],,e. ,;,;k as shown following <br /> on the plans or ordered by the engineer <br /> engineer. <br /> MM <br /> f <br /> E <br /> I <br />