Laserfiche WebLink
P 0 <br /> a <br /> • <br /> 624.1 <br /> f. <br /> locations ordered or permitted by the engineer and in accordance with the requirements <br /> of the plans and specifications. ,. b25.2,silt.2,amSalvaged <br /> r loam silt y <br /> 1 624.2 Materials.The water shall he reasonably clean and free from harmful materials. , lying porUhUns o,f the <br /> : 624.3 Equipment. Water shall be hauled and applied by vehicles equipped with water- , completed rpAdway <br /> tight tanks.The tanks shall be equipped with a suitable pressure-type distributor device 625.3 Constructoor. <br /> 1 which will permit uniform application over the specified area. The tanks shall have a 625,3.1 Pre ar <br /> minimum capacity of MOO gallons and shall be equipped with positive shut-off valves P oeo <br /> capable of being controlled while the vehicle is in motion. with topsoil shAli he ; <br /> required depth with t <br /> 624.4 Construction Methods.The water shall be uniformly applied and incorporated lines,grades,slopes a. <br /> in the manner and amounts, at the times, locations, and for the purposes ordered or • Such work will be, <br /> permitted by the engineer. The tank shall be loaded and unloaded and the equipment • and no additional con, <br /> operated so that waterlogging or other damage will not occur to the suhgrade or base' for in the final mcasur <br /> course. <br /> 625.3.2 Processing <br /> • <br /> 624.5 Method of Measurement. The item of Water will be measured by volume in• cured shall be cleared. <br /> gallons,expressed in thousand-gallon units(M.Gallon),and the quantity to be measured' height of approximate. <br /> for payment shall be the amount of water furnished and applied as directed or permitted ergo material of object <br /> by the engineer in accordance with the contract. The volume will be determined by ap-; The humus-bearing <br /> proved meters or from tanks of known capacity. Water wasted or applied in excess o necessary to produce <br /> requirements will not be measured. depths_taking all pract <br /> soil therewith. <br /> 624.6 Basis of Payment. Water, measured as provided above, will be paid for at the The topsoil thus sin <br /> contract unit price per thousand-gallon(M.Callon)units, which price shall be full corn ' bn the right-of-way so <br /> pensation for furnishing,hauling,applying or incorporating the watci, and for ail labor may be placed directly <br /> materials,equipment, tools and incidentals necessary to complete the work <br /> Y i receive the same. <br /> If the contract does not contain a hid item for Water,then the furnishing and applies;' _ Any appreciable vol ,:: <br /> Lion of water will be considered incidental to other Items of work and no measurement o . C�resc requiremen[s shat <br /> separate payment will be made therefor. <br /> •On,and in the case of S <br /> 11 be made at the app <br /> SECTION 625. TOPSOIL AND SALVAGED TOPSOIL quired to supplant Ihs <br /> 625.3,3 Placing. Aft <br /> pared and finished tc <br /> 625.1 Description. <br /> •all be placed and spree <br /> • <br /> 625.1.1 Topsoil. This work shall consist of the furnishing of humus-bearing so' thccuntract,or if non <br /> adapted to the sustenance of plant life and commonly known as topsoil, from locati. rgnclod by the engint <br /> furnished by the contractor beyond the limits of the right-of-way and the place datI:,t lolls and lumps s <br /> ?l'; spreading and finishing of such topsoil,all as shown on the plans,required in the cont . equipment to prop <br /> q c 1n rban tr other are <br /> or directed by the engineer. ,,:ll pss a one-inch sic. <br /> 1 625.1.2 Salvaged Topsoil. This work shall consist of the removal of topsoil from Roks, twigs,clods tt•sites of proposed roadway excavations and embankments in such amounts and to s ;°Ved and the ent;re su; <br /> depths as available or necessary to cover the slopes of the work, and the reclamaG•; .11 no be required. <br /> 1' placing,spreading and finishing of such topsoil,all as shown or.the plans,required in Where light sandy soi <br /> contract or directed by the engineer types of soils shall b; <br /> 625.2 Materials. ns of discs, harrows, <br /> 625.4!Method of Me <br /> 625.2.1 Topsoil.Topsoil shall consist of the natural loam,sandy loam, pit loam, <br /> • clay loam or clay loam humus-hearing soils adapted to the sustenance of plant lrfc,,'� 6254•! Tap�il.Top <br /> such topsoil shall he neither excessively acid nor excessively alkaline. 'vrded in the ell by c <br /> 1' hen measured by t ' <br /> achral nurnbcr of g. <br /> d <br /> 460 <br /> ri, <br /> • <br /> i, <br />