P 0
<br /> a
<br /> •
<br /> 624.1
<br /> f.
<br /> locations ordered or permitted by the engineer and in accordance with the requirements
<br /> of the plans and specifications. ,. b25.2,silt.2,amSalvaged
<br /> r loam silt y
<br /> 1 624.2 Materials.The water shall he reasonably clean and free from harmful materials. , lying porUhUns o,f the
<br /> : 624.3 Equipment. Water shall be hauled and applied by vehicles equipped with water- , completed rpAdway
<br /> tight tanks.The tanks shall be equipped with a suitable pressure-type distributor device 625.3 Constructoor.
<br /> 1 which will permit uniform application over the specified area. The tanks shall have a 625,3.1 Pre ar
<br /> minimum capacity of MOO gallons and shall be equipped with positive shut-off valves P oeo
<br /> capable of being controlled while the vehicle is in motion. with topsoil shAli he ;
<br /> required depth with t
<br /> 624.4 Construction Methods.The water shall be uniformly applied and incorporated lines,grades,slopes a.
<br /> in the manner and amounts, at the times, locations, and for the purposes ordered or • Such work will be,
<br /> permitted by the engineer. The tank shall be loaded and unloaded and the equipment • and no additional con,
<br /> operated so that waterlogging or other damage will not occur to the suhgrade or base' for in the final mcasur
<br /> course.
<br /> 625.3.2 Processing
<br /> •
<br /> 624.5 Method of Measurement. The item of Water will be measured by volume in• cured shall be cleared.
<br /> gallons,expressed in thousand-gallon units(M.Gallon),and the quantity to be measured' height of approximate.
<br /> for payment shall be the amount of water furnished and applied as directed or permitted ergo material of object
<br /> by the engineer in accordance with the contract. The volume will be determined by ap-; The humus-bearing
<br /> proved meters or from tanks of known capacity. Water wasted or applied in excess o necessary to produce
<br /> requirements will not be measured. depths_taking all pract
<br /> soil therewith.
<br /> 624.6 Basis of Payment. Water, measured as provided above, will be paid for at the The topsoil thus sin
<br /> contract unit price per thousand-gallon(M.Callon)units, which price shall be full corn ' bn the right-of-way so
<br /> pensation for furnishing,hauling,applying or incorporating the watci, and for ail labor may be placed directly
<br /> materials,equipment, tools and incidentals necessary to complete the work
<br /> Y i receive the same.
<br /> If the contract does not contain a hid item for Water,then the furnishing and applies;' _ Any appreciable vol ,::
<br /> Lion of water will be considered incidental to other Items of work and no measurement o . C�resc requiremen[s shat
<br /> separate payment will be made therefor.
<br /> •On,and in the case of S
<br /> 11 be made at the app
<br /> SECTION 625. TOPSOIL AND SALVAGED TOPSOIL quired to supplant Ihs
<br /> 625.3,3 Placing. Aft
<br /> pared and finished tc
<br /> 625.1 Description.
<br /> •all be placed and spree
<br /> •
<br /> 625.1.1 Topsoil. This work shall consist of the furnishing of humus-bearing so' thccuntract,or if non
<br /> adapted to the sustenance of plant life and commonly known as topsoil, from locati. rgnclod by the engint
<br /> furnished by the contractor beyond the limits of the right-of-way and the place datI:,t lolls and lumps s
<br /> ?l'; spreading and finishing of such topsoil,all as shown on the plans,required in the cont . equipment to prop
<br /> q c 1n rban tr other are
<br /> or directed by the engineer. ,,:ll pss a one-inch sic.
<br /> 1 625.1.2 Salvaged Topsoil. This work shall consist of the removal of topsoil from Roks, twigs,clods tt•sites of proposed roadway excavations and embankments in such amounts and to s ;°Ved and the ent;re su;
<br /> depths as available or necessary to cover the slopes of the work, and the reclamaG•; .11 no be required.
<br /> 1' placing,spreading and finishing of such topsoil,all as shown or.the plans,required in Where light sandy soi
<br /> contract or directed by the engineer types of soils shall b;
<br /> 625.2 Materials. ns of discs, harrows,
<br /> 625.4!Method of Me
<br /> 625.2.1 Topsoil.Topsoil shall consist of the natural loam,sandy loam, pit loam,
<br /> • clay loam or clay loam humus-hearing soils adapted to the sustenance of plant lrfc,,'� 6254•! Tap�il.Top
<br /> such topsoil shall he neither excessively acid nor excessively alkaline. 'vrded in the ell by c
<br /> 1' hen measured by t '
<br /> achral nurnbcr of g.
<br /> d
<br /> 460
<br /> ri,
<br /> •
<br /> i,
<br />
|