|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-0000-01097
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
0000 YR
>
DCPCUP-0000-01097
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2016 3:16:30 PM
Creation date
3/30/2016 3:16:28 PM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
01097
Town
Roxbury Township
Section Numbers
16
AccelaLink
DCPCUP-0000-01097
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br /> MINERAL EXTRACTION <br /> • <br /> Requirements for Application, Operation and Reclamation <br /> Sec. 10.12(2)(a) and 10.126(2)(a) Dane County Zoning Ordinance <br /> Mineral Extraction includes quarrying, borrow pits and other processing or removal of <br /> mineral resources including removal of topsoil/black dirt and fill dirt or clay. <br /> APPLICATION SHALL INCLUDE: <br /> 1. A written statement of the operation containing the following: <br /> a. Description of the operation (Sand/gravel; stone quarry; lime; black dirt, etc) . <br /> b. Date operation will commence. <br /> c. Sources, quantity and disposition of water to be used. <br /> d. Estimated date for completion of excavation. <br /> e. Estimated date for completion of reclamation (see RECLAMATION below) . <br /> f. Existing use of the land. <br /> g. Proposed use after reclamation. <br /> 2. Site plan showing: <br /> a. Location of proposed operation. <br /> b. Excavation area showing proposed final elevations. <br /> c. All residences within 600 feet. <br /> d. Location of lakes, rivers, streams, etc. <br /> e. Existing and proposed roads and drives. <br /> OPERATION REQUIREMENTS: <br /> a. Topsoil shall be saved. <br /> b. Excavations below the grade of a public street or highway shall be set back <br /> from said street or highway a distance not less than that required for <br /> buildings and structures under this ordinance. <br /> c. Zoning permits are required for buildings, additions, etc. <br /> RECLAMATION: <br /> a. All final slopes around the area shall be flatter than a 3:1 slope in sand, <br /> gravel or borrow pit operation or in a safe angle or repose in a quarrying <br /> operation. <br /> b. All final slopes and pit areas shall be covered with topsoil and seeded to <br /> prevent erosion. <br /> c. The area shall be cleared of all debris and be left in a workmanlike condition. <br /> OTHER: <br /> a. If land is zoned A-1 or A-2 a conditional use permit is required. <br /> b. If land is zoned A-1 Exclusive or A-3, both rezoning to an appropriate district <br /> and a conditional use permit are required. <br /> c. The conditional use permit shall be for the period of time specified in the <br /> application or as modified by the Zoning and Natural Resources Committee. <br /> d. If the site is within a shoreland, wetland or flood zone other regulations will <br /> apply. <br /> If you have any questions, please call the Zoning Division at 266-4266. <br /> 545-46(9/90) MIN EXTR APPL/RECL INSTR <br />
The URL can be used to link to this page
Your browser does not support the video tag.