Laserfiche WebLink
buffer" on the plan. In the event any of these areas are disturbed, additional erosion <br /> control measures will be required. <br /> 7. The plan includes a construction schedule as follows: <br /> Construction and grading is scheduled to begin November 9, 2015. <br /> The phased stabilization and mulching schedule included in the proposed plan <br /> must be followed. <br /> All disturbed areas must be permanently stabilized, as noted in the plan, by April <br /> 15, 2016. <br /> The construction site must follow the plan according to the schedule approved by Dane County <br /> Water Resource Engineering. This permit will expire on the stabilization date included in the <br /> plan (April 15, 2016) and may be amended prior to permit expiration only. This review is for <br /> the erosion control requirements of Chapter 14, Dane County Code of Ordinances only and <br /> other approvals may be necessary. A permit card must be obtained from Water Resource <br /> Engineering and displayed onsite prior to disturbing ground. <br /> Cc: Ed Short, Exeter Design, Inc. (email) <br /> Eric Rortvedt, P.E., Wisconsin Department of Natural Resources (email <br /> I <br />