Laserfiche WebLink
," `t I J)In jI.11'.I4L - MIIIULt∎ , <br /> AIIgUfit 21, 1 079 <br /> Page 4 <br /> c. Construction of building #1, related driveway base and parking <br /> area base, seeding and mulching or laying of sod shall be com- <br /> I pleted and inspected by the Zoning Department before pro- <br /> ceeding with phase #2 <br /> PHASE #2. <br /> a. Site preparation for building which includes relocation of a <br /> I part of the existing plat development berm to provide ade- <br /> quate room for construction of building #3. <br /> b. Construction of building #3, related driveway base and parking <br /> area base, seeding and mulching or laying of sod shall be com-, <br /> pleted and approved by the Zoning Department before proceeding <br /> with phase #3. <br /> PHASE #3. <br /> a. Site preparation for building #2, including relocation of cente <br /> portion of existing berm and standpipe. Berm upon completion <br /> of construction of building #2 may be utilized as backfill. <br /> b. Phase #3 area shall be seeded and mulched or sodded. <br /> PHASE #4. <br /> a. All drives and parking areas, if not finished previously, shall <br /> be completed. <br /> 5. Zoning Department certificate of compliance may be issued upon <br /> CYcompletion of each phase of construction. Motion carried. <br /> #796. Motion by Schwahn second by Krushcke to amend variance granted <br /> on June 28, 1979 from 9 feet to 10 feet from the required setback from <br /> C.T.H. "A". <br /> FINDING OF FACT: <br /> 1. Zoning inspection disclosed that 10 foot variance was required in,- <br /> stead of 9. <br /> 2. Other factors remain unchanged. <br /> CONCLUSION: <br /> Same as on June 28, 1979; motion carried. <br /> The meeting was adjourned at 10:00 p.m. <br /> Phyllis Schwahn, <br /> Secretary <br /> C <br />