Laserfiche WebLink
C <br /> MINUTES OF TllE MEETING OF THE DANE COUNTY <br /> BOARD OF ADJUSTMENT <br /> COMMITTEE HELD ON NnvrMFRFP 7R4 1984 <br /> The Board of Adjustment committee met on <br /> November 28, 19 84 with the following members present: <br /> PRESENT: Voges, Harvey, Schwahn, Kruschke <br /> ALSO: K. Connors, Fleck. <br /> ��- <br /> ."'(>2 <br /> 3� Siam-r+2 /-rte. <br /> The Board met at 3:00 p.m. at the Stehr property 4980 Borcher's Beach <br /> Road - Section 33, Westport. Other persons in attendance: Attorney R. <br /> Lehmann representing Kaye Stehr; Brian Van DeWalle, Consultant Bernard <br /> Kennedy, Chairman and Robert Shepherd, Supervisor, Town of Westport. <br /> The November 15, 1984 decision of the Board of Adjustment requiring in- <br /> terim surface water run-off be located at the North side of the Stehr <br /> property was reviewed. Other aspects of installation of the necessary <br /> culvert, etc. , to maintain water run-off control were dicussed. <br /> Motion by Schwahn, second by Harvey to rescind Board action of November <br /> 15, 1984 pertaining to interim control of surface water run-off and re- <br /> quire the installation of a permanent culvert as per the following: <br /> 1) . A minimum of a 24" concrete culvert shall be installed along <br /> the North property line taking into consideration the well on the ad- <br /> jacent property and a proper approach to the lake. <br /> 2) . Extension of the culvert under the right-of-way of Borcher's <br /> Beach Road shall be in cooperation with the Town of Westport. <br /> 3) . The project shall be designed to accommodate a surface water <br /> run-off of 23 c. f. s. <br /> 4) . The inlet and outlet shall be designed to prevent erosion. <br /> 5) . Surface pending of water at the front of the Stehr property and <br /> the adjacent lot to the North shall be prevented by providing drainage <br /> via a grassed Swale or appropriate re-.installation of the 8" c.m.p. <br /> (,) . All hack-filled areas shall be thoroughly tamped. <br /> 7) . All dirturhed ,arean shall be needed with dormant seed, mulched <br /> with straw to a 7 straw depth and covered with jute or plastic mattin• <br /> staked in place as per manufacturer's specifications. <br /> 8) . The project shall he completed by December. 31, 1984 and shall be <br /> subject to final approval by the Board of Adjustment. <br />