|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2016-00203
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2016
>
DCPZP-2016-00203
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2016 12:49:44 PM
Creation date
5/6/2016 12:49:39 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2016-00203
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Dane County Water Resource Engineering Division <br /> DINAP - "Do I NEED A PERMIT" <br /> General Information: <br /> Date of Contact: 4/28/2016 <br /> Caller/Contact: Jason Ihm Phone#: (608) 576-9374 <br /> Landowner: Jason lhm Phone #: <br /> Contact Email: jayihm72©gmail.com <br /> Project Address: 10436 Highway ID, Blue Mounds WI 53517 <br /> Location (Municipality): Tn. Blue Mnds Section: 9 1/4: NW <br /> Parcel #: 0608-092-9840-2 <br /> Project Description: Free Stall Barn addition to existing barn <br /> Planned Size of Disturbance: —284 ft2 Planned Size of New Impervious: -2,400 ft2 <br /> Water Resource Engineering Division Response: <br /> Based On Information Above the Project:❑DOES* 0 DOES NOT Require a Permit <br /> Determination Made by: OJAN ❑JDB ❑JAS ❑JAH ❑JRT ❑AJM ❑JRR <br /> Type of Permit Required: ❑Erosion Control EShoreland Erosion Control EStormwater Management <br /> ❑Disturbance > 4000 ft2 ❑ Excavate/Fill>400 yds3 ❑ Disturbing 100' of ditch/channel <br /> ❑ 125' Long new access road/driveway❑ Subdivision Plat/CSM ❑ 20,000 ft2 New Impervious areas <br /> ❑Shoreland Zone Disturbance ❑ Other: <br /> Basis for Determination: Project will not result in 4000 sq.ft. disturbance <br /> Permit determination is based upon the information provided by caller/landowner on the date of contact. <br /> Changes in project size, scope or location may trigger changes to permit requirements. <br /> It is the responsibility of the owner to ensure all required permits have been obtained prior to commencing work. <br />
The URL can be used to link to this page
Your browser does not support the video tag.