|
Help
|
About
|
Sign Out
Home
Browse
Search
1988
DaneCounty-Planning
>
Zoning
>
BOA
>
BOA Minutes
>
1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2016 3:39:37 PM
Creation date
5/6/2016 3:39:27 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
*"4 <br /> B.O.A./Minutes/8/25/88 <br /> Page 10 <br /> 3). That all work be performed in compliance with approved engineering <br /> standards and all applicable governmental rules and regulations particularly <br /> Section 1.05(4) of Dane County Ordinance. <br /> FINDING OF FACT: <br /> 1). Project would have a stabilizing effect on shoreline. <br /> 2). Proposed structure will not obstruct view of water. <br /> CONCLUSION: <br /> 1). The project as planned, with specified conditions; will not result in <br /> substantial detriment to navigable waters by erosion, sedimentation, <br /> impairment of fish or aquatic life, or safe and healthful conditions. <br /> Carried - 4-0. <br /> Jones/Harvey to adjourn. <br /> Carried- 4-0. <br /> Meeting adjourned at 11:45 p.m. <br /> ‘1,J % <br /> Steven H. Reynolds, <br /> Recording secretary /- i <br /> 1 feE/VE p <br /> MINUTES WERE FILED WITH DANE COUNTY CLERK'S OFFICE ON SEP .1' <br /> vas°fzrcF o 5 x988 <br /> "1 Cato <br /> +G <br /> • <br /> Lee <br />
The URL can be used to link to this page
Your browser does not support the video tag.