|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2015-00048
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2015
>
DCPZP-2015-00048
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2016 11:11:56 AM
Creation date
5/13/2016 11:11:55 AM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2015-00048
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DANE COUNTY REGIONAL AIRPORT / <br /> 4000 International Lane Madison, WI 53704 P: 608 • 246 • 3380 F 608 • 246 • 3385 msnairport.com <br /> April 17, 2015 p ,, <br /> Scott Schroeckenthaler DA N E <br /> Zoning Inspector APR 2 0 2015 COUNTY <br /> Dane County Zoning Division REGIONAL <br /> Department of Planning and Development A I R P O R T <br /> M A D I S O N <br /> Room 116, City-County Building e r!F COUNTY PLANNING&DEVELOPMENT <br /> Madison, WI 53709 <br /> Re: Permit Application under §78.06 Dane County Ordinance <br /> Sullivan Design Build Temporary Crane <br /> N 43-10-10.32 W 89-19-07.45 <br /> 7243 Manufacturers Dr., Madison, WI <br /> Dear Mr. Schroeckenthaler: <br /> Below are the conditions the Airport requests the Zoning Administrator establish <br /> for issuance of the permit. <br /> CONDITIONS APPLICABLE TO SULLIVAN DESIGN BUILD CONSTRUCTION <br /> CRANE PERMIT: <br /> (1) Applicant shall comply with all conditions and recommendations set forth in <br /> the Determination Letter regarding Federal Aviation Administration Aeronautical <br /> Study No. 201 5-AG L-2762-N RA. <br /> (2) Prior to erecting the construction crane, applicant shall provide Timothy W. <br /> Butcher, Director of Operations and Public Safety, Dane County Regional Airport <br /> (office: 608.246.3392), with the name and telephone number of an individual(s) <br /> having authority over operation and placement of the crane while it is on the <br /> construction site and, upon request, shall arrange a meeting between Airport <br /> staff and the contractor that will be operating the crane. <br /> (3) Applicant shall, at least three days before the crane height will reach 1,014 <br /> feet MSL, provide notice to Director Timothy W. Butcher. <br /> (4) At all times the highest point of the crane shall be marked during daylight <br /> hours with an orange and white checkered construction flag measuring at least <br /> three feet by three feet, and with a red obstruction light, with a minimum intensity <br /> of 32.5 candela, from two hours before sunset until two hours after sunrise and <br /> during periods of reduced visibility. <br /> (5) Neither the construction crane nor any equipment or other items attached to, <br /> or used to erect the crane, except the above described the flag and light, shall at <br /> any time exceed a height of 1,014 feet MSL. <br />
The URL can be used to link to this page
Your browser does not support the video tag.