Laserfiche WebLink
Erosion Control For Office Use Only <br /> Application Checklist Permit Number: <br /> Associated Permits: <br /> Project Name:Ederer House <br /> 1 <br /> Erosion Control Plan Requirements— Plan Materials X Location of Information: <br /> Page Number or Attachment <br /> 1. Narrative describing the proposed project we Proposed single family home <br /> with attached garage. <br /> 2. Site plan(of known scale that includes:property lines,disturbed area limits,impervious area Grading and Erosion Control <br /> limits(existing and proposed),natural and artificial water features, 100-yr flood plain,delineated ✓ sheet <br /> wetland boundaries, location of all proposed erosion control practices) <br /> NOTE:Grading within 5'of the property line requires department approval <br /> 3. Contours(existing and proposed) we Grading and Erosion Control s <br /> 4. Watershed size for each drainage area(include area draining to the site and within ✓ N/A <br /> project boundaries) <br /> 5. Culvert sizes (existing and proposed) we Grading and Erosion Control s <br /> 6. Cross sections and profiles of ditches,channels,swales and structural ✓ N/A <br /> measures(existing and proposed) <br /> 7. Design calculations for ditches, channels,swales and structural measures N/A <br /> (velocity&capacity calculations) <br /> 8. Direction of runoff flow from impervious surfaces (roof downspouts,driveways,etc.) ✓ Grading and Erosion Control s <br /> 9. Universal Soil Loss Equation(USLE)worksheet(s)(for each element of the erosion USLE worksheet has been <br /> control plan. Dates must correspond to construction schedule and be appropriate for each we filled out and included with <br /> erosion control practice) application <br /> 10. Tracking control (provisions to prevent mud-tracking onto public streets and roads during we Grading and Erosion Control s <br /> construction,e.g.tracking pad or existing gravel drive) <br /> 11. Sediment control practices to protect stormwater facilities or storm sewer N/A <br /> inlets,existing and proposed,on or adjacent to the site(e.g. inlet protection or ✓ <br /> stone weeper) <br /> 12. Site stabilization details&methods (type&rate of fertilizer,seed,mulch,sod,etc.) we Grading and Erosion Control s <br /> 13. Any other necessary information pertaining to the physical or environmental ✓ N/A <br /> features of the site <br /> Erosion Control Plan Requirements - Performance Standards X Location of Information: <br /> Page Number or Attachment <br /> 14. Prevent gully and bank erosion ✓ Noted <br /> 15. Practices must reduce erosion to minimum sheet and rill erosion standards: we See USLE worksheet and plans <br /> (7.5 tons/acres/year) <br /> 16. Proof of stable outlet capable of carrying site runoff at a non-erosive velocity if N/A <br /> (outlet design must account for flow capacity and duration) <br /> Permit Application Requirements X Location of Information: <br /> Page Number or Attachment <br /> 17. Timetable and construction schedule we See Project Narrative <br /> 18. Preliminary review letter we Prelim Review was in person <br /> 19. Copies of permits or approval from other agencies (WDNR, US Army Corps of we N/A <br /> Engineers,County Zoning,Town,etc.) <br /> 20. Itemized estimated cost of erosion control plan implementation (including we Less than $5,000 <br /> installation and labor) <br /> 21. Financial responsibility(financial security instrument required if cost estimate exceeds we Less than $5,000 <br /> $5000) <br /> Revised 03.21.2016 <br />