Laserfiche WebLink
3/11/2016 Outlookcom Print Message <br /> Print Close <br /> From: Alex Thiem(alex.thien@bugtusselwireless.com) <br /> Sent: Fri 3/11/16 2:44 PM <br /> o: littellscott@hotmalcom(littellscott@hotmail.com) <br /> Cc: Ken Franzen(Ken.Franzen@bugtusselwireless.com) <br /> Ken/Scott <br /> Costs for co-location: <br /> Structural analysis $1500 <br /> Site walk/Lease exhibit $450 <br /> Construction drawing $1400 <br /> LTE Equipment- $34,000- Cabinet, antennas, radio heads <br /> A&L Material $7,000- Fiber/power runs, sectors, ice bridge <br /> A&L Install Labor $9,000- Labor to install antennas, radio heads, sectors, and ice bridge <br /> Site/commissioning $6,000- Labor to install power/fiber lines and batteries in cabinet, complete <br /> testing and commissioning of the site. <br /> Civil construction $7,500- Provide labor and materials to install equipment pad, below/above <br /> grade grounding and power/fiber conduit <br /> Building Permit $300- <br /> Total- $67,150 <br /> Alex <br /> httpsJ/bay178.mail.Iii e.conJd/mail rn c/PrintMessages?nld=emus 1/1 <br />