|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPREZ-0000-05210
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
0000 YR
>
DCPREZ-0000-05210
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2016 9:32:08 AM
Creation date
5/26/2016 9:32:00 AM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
Rezone
Petition Number
05210
Town
Vienna Township
Section Numbers
13
AccelaLink
DCPREZ-0000-05210
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
If Wisconsin Department of Transportation �1. <br /> TRANSPORTATION DISTRICT I <br /> October 31, 1991 2101 Wright Street <br /> Madison,WI 53704-2583 <br /> JOHN NORWELL PE <br /> DANE COUNTY HIGHWAY COMMISSIONER <br /> 2302 FISH HATCHERY ROAD <br /> MADISON WI 53713 <br /> Dear Mr. Norwell: <br /> RE: Flying "J" Plaza <br /> CTH V and IH 90/94 <br /> We have reviewed the proposal for a truck Plaza near the interchange of CTH V <br /> and IH 90/94. It is our position that if this proposal proceeds, that a major <br /> expansion of the interchange will be required. <br /> Currently, CTH V and the bridge over IH 90/94 provide only one lane in each <br /> direction. There are no protected left-turn lanes for traffic turning onto <br /> the ramps. When the traffic generated by the proposed Plaza is added to the <br /> existing traffic on CTH V, it will create congestion and a safety concern. <br /> It will be necessary to reconstruct the interchange to provide four traffic <br /> lanes and a median with protected left-turn lanes on CTH V. Another bridge <br /> over IH 90/94 would also be required. <br /> To accomplish such a project on CTH V, which is under county jurisdiction, <br /> will require that the County and the Department agree to cost share the <br /> project. Since this would be a capacity expansion project, the local share <br /> would be 25% of the cost of design, right-of-way, utility adjustment and <br /> construction. Also, keep in mind that such a project must compete with <br /> other needed improvements within the District. <br /> Please keep us informed on the progress of this proposed development. <br /> Sincerely - <br /> LeRoy BesYer, P.E. <br /> Acting District Chief Planning Engineer <br /> LRB:ry/3678 <br />
The URL can be used to link to this page
Your browser does not support the video tag.