Laserfiche WebLink
Page 3 <br /> Committee meetings involving 6-10 people held an average of 3 <br /> nights a week <br /> Choir: Adult and Children - practice, each choir once per <br /> week (6 - 12 people) <br /> Occasional use for weddings, funerals, etc. <br /> Currently there is light usage of the building by several <br /> Scout Troops and other non-profit groups <br /> 4 . OUR CONCERN FOR SAFETY: <br /> The current owner has agreed to give the church an ease- <br /> ment to use the existing driveway since this lot fronts Highway <br /> Q which is a controlled access highway. The county highway <br /> department has reviewed the application for the church drive- <br /> way permit. They determined there was excellent visibility <br /> in both directions and that peak church usage coincided with <br /> low traffic volumes on Hwy Q. The County Transportation <br /> Committee endorsed the application and agreed to grant the <br /> permit at their 1/27/92 meeting. <br /> 5.A. PROPOSED USE OF PROPERTY <br /> The lot described in this application would be used by <br /> the First Presbyterian Church of Waunakee as a building site <br /> for a new church. The new facility would include a sanctuary, <br /> fellowship space, room for Christian education and office <br /> space. We have been in our present church building at the <br /> corner of Fish and 2nd for 114 years , with a sanctuary that <br /> seats about 90 people, and a congregation currently numbering <br /> more than twice that many people. It is projected that the <br /> new facility would meet our space needs for at least the next <br /> 20 years. Adequate parking space would be provided. Land- <br /> scaping would be used to soften the features and preserve the <br /> pastoral setting. The greatest possible care would be taken <br /> in the process of design to ensure the construction of a <br /> church building of which the communities of Waunakee and <br /> Westport could be proud. <br /> B. TENTATIVE TIME SCHEDULE FOR DEVELOPMENT <br /> Planning and design Completed by September 1992 <br /> Start of construction March 1993 <br /> Completion of Sanctuary July/August 1993 <br /> Building completion Fall 1993 <br />