|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPFLO-2016-00006
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2016
>
DCPFLO-2016-00006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2016 1:55:05 PM
Creation date
6/10/2016 1:54:32 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPFLO-2016-00006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DANE COUNTY SHORELAND ZONING PERMIT ZONING PERMIT NO. Page 2of2 <br /> DCPSHL-2016-00032 <br /> Conditions:1. THIS APPROVAL BY DANE COUNTY ZONING IS ONLY FOR THE PLAN AS <br /> PRESENTED. ANY MODIFICATION TO THE PROJECT REQUIRES THE EXPRESS WRITTEN <br /> APPROVAL BY DANE COUNTY ZONING. THIS PERMIT SHALL BE NULL AND VOID IF ANY <br /> MODIFICATIONS A' • DE WITHOUT THE EXPRESS WRITTEN APPROVAL OF DANE COUNTY <br /> ZONING. INITIALS kr/ <br /> PERMIT CONDITIONS: <br /> 1. NO WORK TO START UNTIL A SHORELAND EROSION CONTROL PERMIT HAS BEEN ISSUED. <br /> 2. ANY DISTURBANCE TO WETLANDS AND THE VEGETATIVE BUFFER ZONE SHALL BE RESTORED TO <br /> PRE-DEVELOPMENT CONDITIONS OR BETTER. <br /> 3. FILLING AND GRADING WITHIN THE WETLANDS IS LIMITED TO THAT WHICH IS NECESSARY FOR <br /> THE INSTALLATION OF THE BRIDGE. <br />
The URL can be used to link to this page
Your browser does not support the video tag.