|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPFLO-2016-00006
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2016
>
DCPFLO-2016-00006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2016 1:55:05 PM
Creation date
6/10/2016 1:54:32 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPFLO-2016-00006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Vii' t Dane County Land & Water Resources Department <br /> Administration • Land Conservation • Office of Lakes&Watersheds• Parks • Water Resource Engineering <br /> Kevin F.Connors,Director <br /> • <br /> June 8,2016 <br /> Dane County Planning and Development <br /> Room 116 <br /> City-County Building <br /> Madison, WI 53703 <br /> Floodplain Development Permit DCPFLO-2016-00006 <br /> Falk Wells County Park Sugar River Pedestrian Bridge <br /> Town of Montrose,Section 3 <br /> The proposed pedestrian bridge will be located at the former dam location crossing the Sugar River at <br /> Falk Wells County Park.The plan conforms to Dane County Code of Ordinance, Chapter 17,Floodplain <br /> Regulations. <br /> The current FEMA base flood elevation is approximately 904' according to FEMA FIRM panel number <br /> 55025C0566. The pedestrian bridge will have a low chord of the bridge at or above 905'. Specifically, <br /> the following conditions were considered in the design: <br /> • This development shall not obstruct flow, defined as development which blocks the conveyance <br /> of floodwaters by itself or with other development, causing any increase in the regional flood <br /> height; or cause any increase in the regional flood height due to floodplain storage area lost. <br /> • Bridge shall be designed and constructed to have a low flood damage potential. <br /> • Adequate flood proofing measures shall be provided to the flood protection elevation. <br /> The attached map provides a site location of the bridge, including contour elevations. The bridge <br /> abutments shall be constructed on existing elevation above the flood elevation and clear span across the <br /> river. <br /> Sincerely, <br /> John Reimer, PE Stormwater Engineer �-� • 1044° - <br /> f,, . <br /> Lyman F.Anderson Agriculture&Conservation Center <br /> 5201 Fen Oak Drive,Room 208,Madison,Wisconsin 53718-PH:608/224-3730,FAX:608/224-3745 <br /> ww w.countyofdane.comllwrd <br />
The URL can be used to link to this page
Your browser does not support the video tag.