Laserfiche WebLink
BOA MINUTES/11/29/90 <br /> Page 4 <br /> Motion carried - 4-0. <br /> Appeals from previous hearings: <br /> #1991. Mertens - Cottage Grove - 6/28/90: <br /> Harvey/Arts to hold in abeyance until December Hearing. <br /> Motion carried - 4-0. <br /> #2025. Matz - Berry - 8/23/90: <br /> Quackenbush/Harvey to dismiss appeal as variance no longer needed due to <br /> ordinance compliance. Motion carried - 4-0. <br /> #2028. Karem - Medina - 9/27/90: <br /> Quackenbush/Harvey to hold in abeyance until December Hearing upon request of <br /> applicant. <br /> Motion carried - 4-0. <br /> #2037. Robar - Dunn - 9/27/90: <br /> Applicant has withdrawn appeal. <br /> #2039. Ryan - Dunn - 9/27/90: <br /> Quackenbush/Harvey to grant deck over existing boathouse as constructed. <br /> Harvey/Quackenbush to deny above grade decking/walkway connecting residence to <br /> boathouse. <br /> Motion carried - 4-0. <br /> FINDING OF FACT: <br /> 1). Applicant replace original decking over boathouse, not expanding. <br /> 2). Deck does not infringe on setback to normal high watermark. <br /> 3). To approve connecting walkway would be precedent setting - in fact others <br /> denied in immediate area. <br /> CONCLUSION: <br /> (DECK): 1). Variance preserves the zoning ordinance as much as possible <br /> without injustice to applicant. 2). Variance is not contrary to rights of <br /> others or to the public interest. <br /> (WALKWAY): 1). Unnecessary hardship was not proven. <br /> #2047. Cantecessi - Albion - 10/25/90: <br /> Quackenbush/Harvey to deny requested variance from rearyard requirement. <br /> FINDING OF FACT: <br /> 1). Deck constructed without required permits, deck size is 16' x 20' . <br /> 2). Ordinance permits 12 foot encroachment into required rearyard. <br /> 3). Area is already congested and there is need for some open space. <br /> CONCLUSION: <br /> 1). Unnecessary hardship was not proven. <br /> Motion carried - 4-0. <br /> (re <br />