Laserfiche WebLink
DL WITTER <br /> P R I N T I N G . <br /> EROSION CONTROL PLAN <br /> Location NW4 NE4 of sec 2 , T8N, R6E. TWN. of Mazomanie <br /> 1 .Driveway has been surveyed, showing planned profile and location <br /> on property. Refer to attached survey plan sheet <br /> 2 .The driveway will be covered with road gravel immediatley <br /> upon completion of grading. A 50 foot section of the driveway <br /> adjacent to Dunlop Hollow Road, will be covered with gravel <br /> immediatly upon begining construction to prevent tracking onto <br /> town road . <br /> 3 .Grading work will begin sept 1 , 1992 and all erosion control <br /> measures will be completed immediatly upon completion of grading <br /> but not later than sept . 15, 1992 . <br /> 4.All disturbed land areas along driveway and building site <br /> will be : 1 ) covered with 4" of topsoil (suitable) 2 ) seeded with <br /> a grass mixture of Kentucky Bluegrass at a pure live seed rate <br /> of 8 pounds per acre and Creeping Red Fescue at a pure live rate <br /> of 16 pounds per acre. 3 ) Fertilized with a mixture of 20N-10P-10K <br /> at a rate of 500 pounds per acre and 4) Mulched with straw <br /> at a rate of 1 .5 tons per acre (Approximately 60 bales and <br /> 5 to 7 straws thick <br /> 5 .Mulch will be anchored by mechanically pressinginto soil with a <br /> straight disc or other approved method such as tack coating. <br /> 6.Two 18 inch x 30 foot culverts will be installed under driveway <br /> at station 0+00 and station 1+80 . <br /> 7.The discharge end of culverts will have a 10 foot long by 10 foot <br /> wide section shaped for drainage . The shaping will be topsoiled <br /> seeded, fertilized and mulched as in note no. 4 of this plan. <br /> Erosion matt will also be placed over the shaped area and secured <br /> with staples . Placement will be done to manufactures specifications . <br /> 8 .A ditchwill be cut along the north side of the driveway from station <br /> 4 + 50 to station 0 + 50. The ditch will have a 4 foot flat bottom, <br /> 3 to 1 side slopes and a depth of 1 foot. The ditch will be top <br /> soiled, seeded, fertilized and mulched as in note No. 4 of this plan. <br /> Erosion mat will also be placed in the ditch up to the 1 foot <br /> depth line and secured with staples . Placement will be done <br /> according to the manufactures specifications . <br /> 2525 Advance Road <br /> Madison,Wisconsin 53704 <br /> Voice 608-221-2002 <br /> Fax 608-221-4335 <br />