Laserfiche WebLink
'DL WITTER <br /> PR IN T I N G <br /> 9.Erosion bales will be installed prior to any land disturbance <br /> below the disturbed area from station 4 + 00 to station 6 + 50 <br /> and below the disturbed area of the building site . Erosion <br /> bales will be firmly staked down into the ground and entrenched <br /> 4 inches deep. The bales will have less thanf 100 feet of <br /> run off distance above them. <br /> 10 .All erosion control measures including erosion bales, ditches, and <br /> slopes will be inspected within 24 hours after a storm or during <br /> periods of prolonged rainfall . Repair or replacement of damaged <br /> areas will be made immediately. <br /> 11 .Sediment deposits will be removed behind erosion bales after each <br /> storm event or when they reach half the height of the bale. <br /> 12 .Shaping of pastureland along north section fence line will be <br /> done to repair existing gulleying = shaping areas will be topsoiled, <br /> seeded, fertilized, and mulched according to note No. 4 of this plan. <br /> 2525 Advance Road <br /> Madison,Wisconsin 53704 <br /> Voice 608-221-2002 <br /> Fax 608-221-4335 <br />